
Service & Top quality controlWe provide comprehensive drawings and supply whenever required. In 2008, it was awarded with “Nationwide Export Commodity Inspection-free Enterprise”. Far more importantly, we make specific areas according to equipped drawings/samples and warmly welcome OEM inquiries.
Item description of Frequent Glazed Shade Metal 840 Roll Forming EPT for Roof Panel
Glazed tile roll forming EPT is one of our primary merchandise, it is much more and more common in modern many years simply because it’s beautiful in look amp EPT in design and style. We are a really skilled maker of glazed tile roll forming EPT, with mature technique and far more than 23 years’ experience, our EPTs have been sent to numerous international locations all about the planet and gained a excellent track record for us.
This type of EPT is very popular and typical utilised in recent years
您可能喜欢类似的EPT:
Functioning procedure
The comprehensive line incEPTs decoiler, forming EPT, computer controlling technique and run out tables. Our EPTs are geared up with a laptop controlling program to hold goods correct.
主要参数
不 | 种类 | 规格 | |
一 | Uncooked content | 种类 | PPGI |
| Feeding materials width | 914/一千/1200/1220/1250 毫米 | ||
| 厚度 | .three-.8 mm or as customer’s request | ||
二 | 开卷机 | 手术 | 指导 |
| WeigEPT 能力 | 5吨 | ||
3 | Primary body | 滚筒站 | 11 row |
| 轴的直径 | 75毫米 | ||
| 轴材料 | 45#,带0.05毫米镀铬层 | ||
| 辊筒材料 | 45#,带0.05毫米镀铬层 | ||
| 种类 | EPT品种 | ||
| 框架 | 350毫米C型梁 | ||
| 框架厚度 | 16毫米 | ||
| EPT | Cr 12 | ||
| 手术 | EPT计算机化 | ||
| Operating pace | Frequent three-5 m/min and servo motor 6-10m/min | ||
4 | EPT | 行车道 | one.2 inch EPT |
| Primary motor | 5.5千瓦 | ||
| EPT 站 EPT | seven.five KW | ||
| 电压 | 380V/50HZ, three phase | ||
五 | 管理箱 | Electrical box | PLC management program, invEPTr |
| PLC制造商 | Delta在EPTiwan生产 | ||
| 逆变器制造商 | Delta在EPTiwan生产 | ||
| 语言 | EPT 和 EPT | ||
导向开卷机
It is passive sort could load coil by expend the blots repair at coil inner diameter. It truly is straightforward to operate and inexpensive resolution.
西湖 (XiHu) Dis.hu (West Lake) Dis. device
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to manage the width and situation of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the appropriate position and passed to the roll forming method. Can alter the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It truly is set framework to make certain can not shift effortlessly.
辊压成型技术:
Roll forming program consist of EPT body, EPT technique, EPT motor and roll forming method.
A. EPT body adopts welding composition with shot blasting and portray remedy
B. All rollers substance adopt substantial good quality No. 45 steel, with difficult chrome coated on surface area, all therapy by complete CNC EPTs, to make certain the rollers with very good rigidity and precision, and kind ideal roofing sheet as for each style.
C. All rolling shafts are created by high top quality No. forty five metal with quench and temper therapy, so the shafts with very good rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting structure variety is metal wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the back/EPT roller EPTn by EPT, element of upper/decrease rollers EPTn by EPT
F. Adjust the screw bar manually to modify the distance in between higher/reduce rollers for distinction thickness of sheet.
(Focus: all rolling program has altered in our business as a ideal circumstance, we will not advise to adjust the rollers at random, if essential, must adjust by a knowledgeable technician or soon after prepare by our engineer. Normally will result in the EPT can not form a very good profile
Cutting unit
A. Adopts put up cutting, the cutting blade content is Cr12 with quenched treatment method, right after slicing, there is no substance wasted.
B. Adopts welded body for excellent rigidity.
C. The reducing motion is droved by the EPT from EPT station which guarantees the procession of the chopping and low noisy, EPT existence.
EPT系统
It is managed by EPT wheel oil pump. After filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the chopping occupation.
该项目包括一套EPT储罐、一套EPT油泵、两根EPT管道和两套电磁阀。
油泵EPT:3千瓦
EPT油:40#
PLC manage technique
It adopts EPT computer to control. The concentrate on piece’s duration is adjustable and digit of it can be modified. Computed manner has two modes: automatic and handbook one particular. The technique is effortless to operate and use.
Processing precision: inside 1.00mm
It contains liquid crystal EPT, programmer, transformer for the digital EPTs and kits of every single element. Touch EPT
PLC是EPTiwan Panasonic
传感器型号为EPTiwan Delta
The vendor should give EPT and EPT language EPT
柜台
One counter gauges length, pulses, and decides duration.
Function steps
To verify EPT online video or more particulars, get in touch with with me
We EPT sell to heaps of countries
我们的认证
Business data
EPT team is a expert producer developing and making roll forming EPTs estabEPTd in 1996年6月我们有 4 factories functioning in BeiEPTg, TianEPT and ZheJiang province. More than four hundred workers give provider for u.
EPT largely incEPT trapezoidal steel roof/wall panel EPT, C ampZ shape purline EPT, freeway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat doorway forming EPT, reducing EPT, downpipe EPT, gutter EPT, and so on.
如何来访?
我们的支持
1. Free of charge specialized help and totally free accessories provide.
2. Engineer obtainable to service EPTry overEPT.
three. 1 12 months guarantee is provided.
4. EPT lifestyle specialized guidance for free.
five. We alwaEPToffer technical assistance, swift response, all your inquire will be replied in 24 hours.
Query amp Response
one. Q: How to go to our company:
A:飞往北港机场:乘坐快车从北港南站到杭爱机场西站
(1hour), then we can choose up you to factory(40min).
B: Fly to ZheJiang Airport: By fast train From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.five several hours), then we can choose up you to manufacturing unit(40min).
2. Q: What should I give if I want to tailored EPT?
A: U need to have give profile drawing, materials, thickness, voltage and your EPT needs.
三、问:保证是什么?
A: Inside of 12 mounts, all technicals are completely ready to provide you at any time.
4. 问:如果EPT损坏了,该怎么办?
A: Our EPT’s warranty period is 12 months, if the broken areas cannot fix, we will send out
new parts change the broken parts free, but you need to have shell out the convey EPT if after guarantee period of time. we can negotiate to solve the difficulty, and we offer the specialized assistance for EPT lifestyle of gear.
五、问:如果想让技术人员到车间进行调试和培训,该怎么做?
A: We despatched technician to your place to resolve the EPT. Consumer need to bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical journey ticket and appropriate lodging, also purchaser ought to shell out the income a hundred USD/working day.

