
Service & Top quality controlWe provide comprehensive drawings and supply whenever required. In 2008, it was awarded with “Nationwide Export Commodity Inspection-free Enterprise”. Far more importantly, we make specific areas according to equipped drawings/samples and warmly welcome OEM inquiries.
Item description of Frequent Glazed Shade Metal 840 Roll Forming EPT for Roof Panel
Glazed tile roll forming EPT is one of our primary merchandise, it is much more and more common in modern many years simply because it’s beautiful in look amp EPT in design and style. We are a really skilled maker of glazed tile roll forming EPT, with mature technique and far more than 23 years’ experience, our EPTs have been sent to numerous international locations all about the planet and gained a excellent track record for us.
This type of EPT is very popular and typical utilised in recent years
비슷한 EPT를 원하시면 다음과 같은 것을 고려해 보세요.
Functioning procedure
The comprehensive line incEPTs decoiler, forming EPT, computer controlling technique and run out tables. Our EPTs are geared up with a laptop controlling program to hold goods correct.
Main parameter
아니요 | 다양성 | 사양 | |
하나 | 익히지 않은 콘텐츠 | 종류 | PPGI |
| Feeding materials width | 914/a thousand/1200/1220/1250 mm | ||
| 두께 | .three-.8 mm or as customer’s request | ||
둘 | 디코일러 | 작업 | 가이드 |
| WeigEPT 용량 | 5톤 | ||
3 | Primary body | 롤러 스테이션 | 11 row |
| 샤프트의 직경 | 75mm | ||
| Shaft materials | 0.05mm 크롬 도금이 된 45# | ||
| Roller material | 0.05mm 크롬 도금이 된 45# | ||
| 친절한 | EPT 품종 | ||
| 액자 | 350mm C형 빔 | ||
| 프레임 두께 | 16mm | ||
| EPT | Cr 12 | ||
| 작업 | EPT 컴퓨터화 | ||
| Operating pace | Frequent three-5 m/min and servo motor 6-10m/min | ||
4 | EPT | 운전로 | 1.2인치 EPT |
| Primary motor | 5.5kW | ||
| EPT 역 EPT | seven.five KW | ||
| 전압 | 380V/50HZ, three phase | ||
다섯 | Management box | 전기 박스 | PLC management program, invEPTr |
| PLC 제조업체 | EPTiwan에서 생산된 Delta | ||
| 인버터 제조업체 | EPTiwan에서 생산된 Delta | ||
| 언어 | EPT와 EPT | ||
가이드 디코일러
It is passive sort could load coil by expend the blots repair at coil inner diameter. It truly is straightforward to operate and inexpensive resolution.
서호(西湖) Dis.hu(西湖) Dis. 장치
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to manage the width and situation of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the appropriate position and passed to the roll forming method. Can alter the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It truly is set framework to make certain can not shift effortlessly.
Roll Forming Technique:
Roll forming program consist of EPT body, EPT technique, EPT motor and roll forming method.
A. EPT 본체는 쇼트 블라스팅 및 도색 처리를 거친 용접 조성물을 채택합니다.
B. All rollers substance adopt substantial good quality No. 45 steel, with difficult chrome coated on surface area, all therapy by complete CNC EPTs, to make certain the rollers with very good rigidity and precision, and kind ideal roofing sheet as for each style.
C. All rolling shafts are created by high top quality No. forty five metal with quench and temper therapy, so the shafts with very good rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting structure variety is metal wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the back/EPT roller EPTn by EPT, element of upper/decrease rollers EPTn by EPT
F. Adjust the screw bar manually to modify the distance in between higher/reduce rollers for distinction thickness of sheet.
(Focus: all rolling program has altered in our business as a ideal circumstance, we will not advise to adjust the rollers at random, if essential, must adjust by a knowledgeable technician or soon after prepare by our engineer. Normally will result in the EPT can not form a very good profile
Cutting unit
A. Adopts put up cutting, the cutting blade content is Cr12 with quenched treatment method, right after slicing, there is no substance wasted.
B. Adopts welded body for excellent rigidity.
C. The reducing motion is droved by the EPT from EPT station which guarantees the procession of the chopping and low noisy, EPT existence.
EPT 시스템
It is managed by EPT wheel oil pump. After filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the chopping occupation.
이 프로그램에는 EPT 탱크, EPT 오일 펌프 세트, EPT 파이프 2개, 그리고 전자기 밸브 세트 2개가 포함됩니다.
오일 펌프의 EPT: 3kW
EPT 오일: 40#
PLC manage technique
It adopts EPT computer to control. The concentrate on piece’s duration is adjustable and digit of it can be modified. Computed manner has two modes: automatic and handbook one particular. The technique is effortless to operate and use.
가공 정밀도: 1.00mm 이내
It contains liquid crystal EPT, programmer, transformer for the digital EPTs and kits of every single element. Touch EPT
PLC는 EPTiwan Panasonic입니다.
변환기 모델은 EPTiwan Delta입니다.
The vendor should give EPT and EPT language EPT
계수기
One counter gauges length, pulses, and decides duration.
Function steps
To verify EPT online video or more particulars, get in touch with with me
We EPT sell to heaps of countries
저희 인증
비즈니스 데이터
EPT team is a expert producer developing and making roll forming EPTs estabEPTd in 1996년 6월우리는 가지고 있습니다. 4개의 공장 functioning in BeiEPTg, TianEPT and ZheJiang province. More than four hundred workers give provider for u.
EPT largely incEPT trapezoidal steel roof/wall panel EPT, C ampZ shape purline EPT, freeway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat doorway forming EPT, reducing EPT, downpipe EPT, gutter EPT, and so on.
How to visit us?
우리의 지원
1. Free of charge specialized help and totally free accessories provide.
2. Engineer obtainable to service EPTry overEPT.
three. 1 12 months guarantee is provided.
4. EPT lifestyle specialized guidance for free.
five. We alwaEPToffer technical assistance, swift response, all your inquire will be replied in 24 hours.
Query amp Response
1. 질문: 저희 회사로 오시는 방법은 무엇인가요?
A: Fly to BeiEPTg Airport: By quick teach From BeiEPTg South station to HangEPT west station
(1hour), then we can choose up you to factory(40min).
B: Fly to ZheJiang Airport: By fast train From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.five several hours), then we can choose up you to manufacturing unit(40min).
2. Q: What should I give if I want to tailored EPT?
A: U need to have give profile drawing, materials, thickness, voltage and your EPT needs.
3. 질문: 보증 내용은 무엇입니까?
A: Inside of 12 mounts, all technicals are completely ready to provide you at any time.
4. 질문: EPT가 손상된 경우 어떻게 해야 하나요?
A: Our EPT’s warranty period is 12 months, if the broken areas cannot fix, we will send out
new parts change the broken parts free, but you need to have shell out the convey EPT if after guarantee period of time. we can negotiate to solve the difficulty, and we offer the specialized assistance for EPT lifestyle of gear.
five. Q: If want technician to workshop to debug and teach, how to do?
A: We despatched technician to your place to resolve the EPT. Consumer need to bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical journey ticket and appropriate lodging, also purchaser ought to shell out the income a hundred USD/working day.

