
makes certain the stability and consistency of the important operate of components. EPG will often adhere to it company spirit of being useful, modern, efficient and exceptional to make the leading worldwide transmission generate. In the meantime, our goods are made according to high top quality requirements, and complying with the worldwide superior standard criteria. Solution description of Africa employed big corrugated roof glazed tile roll forming EPT
Glazed tile roll forming EPT is a single of our main merchandise, it is more and much more well-liked in recent years due to the fact it truly is stunning in look amp EPT in style. We are a extremely skilled company of glazed tile roll forming EPT, with experienced technique and far more than 23 years’ expertise, our EPTs have been despatched to many nations around the world all about the entire world and received a good status for us.
This kind of EPT is very well-known and frequent used in current many years
Equivalent EPT probably u like:
Doing work method
The full line incEPTs decoiler, forming EPT, pc controlling method and run out tables. Our EPTs are equipped with a pc managing system to keep goods accurate.
主要参数
不 | 类型 | 规格 | |
一 | 原料 | 种类 | PPGI |
| Feeding materials width | 914/一千/1200/1220/1250 毫米 | ||
| 厚度 | .3-.8 mm or as customer’s ask for | ||
2 | 开卷机 | 手术 | 手册 |
| WeigEPT 能力 | 五吨 | ||
三 | Major body | 滚筒站 | 13 row |
| 轴的直径 | 75毫米 | ||
| Shaft material | 45#,带0.05毫米镀铬层 | ||
| Roller content | 45#,带0.05毫米镀铬层 | ||
| 类型 | EPT品种 | ||
| 身体 | 350毫米C型梁 | ||
| 身体厚度 | 16毫米 | ||
| EPT | Cr twelve | ||
| 程序 | EPT计算机化 | ||
| Functioning velocity | Common three-5 m/min and servo motor 6-10m/min | ||
4 | EPT | 行车道 | one.two inch EPT |
| 主电机 | five.five KW | ||
| EPT 站 EPT | 7.5千瓦 | ||
| 电压 | 380V/50HZ, three stage | ||
5 | 控制盒 | 电动箱 | PLC management system, invEPTr |
| PLC品牌 | Delta 由 EPTiwan 创建 | ||
| 逆变器制造商 | Delta made in EPTiwan | ||
| 语言 | EPT 和 EPT | ||
导向开卷机
It is passive variety could load coil by expend the blots repair at coil inner diameter. It truly is effortless to function and inexpensive resolution.
西湖 (XiHu) Dis.hu (West Lake) Dis. unit
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to control the width and position of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the correct placement and handed to the roll forming program. Can adjust the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT placement. It is fixed framework to make confident can not go simply.
Roll Forming Program:
Roll forming system consist of EPT body, EPT method, EPT motor and roll forming method.
A. EPT frame adopts welding composition with shot blasting and painting remedy
B. All rollers material adopt substantial high quality No. forty five steel, with challenging chrome coated on surface area, all remedy by complete CNC EPTs, to make confident the rollers with great rigidity and precision, and sort excellent roofing sheet as for every design and style.
C. All rolling shafts are produced by substantial quality No. forty five metal with quench and mood treatment method, so the shafts with great rigidity which could use for EPT tern without having deformation.
D. Rolling shafting supporting structure type is metal wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the back/EPT roller EPTn by EPT, component of higher/reduced rollers EPTn by EPT
F. Change the screw bar manually to alter the distance amongst upper/lower rollers for variation thickness of sheet.
(Interest: all rolling method has altered in our firm as a ideal circumstance, we do not advise to modify the rollers at random, if needed, should adjust by a experienced technician or soon after teach by our engineer. In any other case will cause the EPT can not form a good profile
Cutting device
A. Adopts post slicing, the chopping blade substance is Cr12 with quenched treatment method, following cutting, there is no substance wasted.
B. Adopts welded frame for great rigidity.
C. The cutting action is droved by the EPT from EPT station which guarantees the procession of the chopping and minimal noisy, EPT life.
EPT Technique
It is controlled by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the reducing job.
The technique incEPTs a set of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
油泵EPT:3千瓦
EPT油:40#
PLC control program
It adopts EPT personal computer to management. The target piece’s size is adjustable and digit of it can be modified. Computed method has two modes: computerized and manual a single. The program is simple to run and use.
Processing precision: inside of one.00mm
It contains liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of each element. Touch EPT
PLC是EPTiwan Panasonic
传感器品牌名称为EPTiwan Delta
The vendor need to offer EPT and EPT language EPT
柜台
A single counter gauges duration, pulses, and decides duration.
Perform steps
To check out EPT video clip or far more information, get in touch with with me
We EPT offer to heaps of international locations
我们的认证
公司详情
EPT group is a skilled producer creating and making roll forming EPTs estabEPTd in 1996年6月我们有 四家工厂 functioning in BeiEPTg, TianEPT and ZheJiang province. More than 400 workers give provider for u.
EPT mainly incEPT trapezoidal metal roof/wall panel EPT, C ampZ form purline EPT, highway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, reducing EPT, downpipe EPT, gutter EPT, and so forth.
How to go to us?
我们的供应商
1. Totally free technical help and totally free add-ons provide.
2. Engineer obtainable to services EPTry overEPT.
3. One particular year guarantee is supplied.
4. EPT existence complex advice for free of charge.
5. We alwaEPToffer specialized support, quick reaction, all your inquire will be replied in 24 hours.
Concern amp Reply
1. Q: How to visit our organization:
A: Fly to BeiEPTg Airport: By fast train From BeiEPTg South station to HangEPT west station
(1hour), then we can choose up you to factory(40min).
B: Fly to ZheJiang Airport: By rapidly prepare From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(4.five several hours), then we can select up you to manufacturing facility(40min).
2. Q: What need to I give if I want to tailored EPT?
A: U require supply profile drawing, materials, thickness, voltage and your EPT demands.
3. 问:保证是什么?
A: Inside twelve mounts, all technicals are completely ready to serve you at any time.
4. 问:如果EPT损坏了,该怎么办?
A: Our EPT’s warranty period is twelve months, if the broken parts can’t mend, we will ship
new parts replace the broken components free, but you want spend the convey EPT if soon after guarantee period. we can negotiate to remedy the problem, and we provide the technical assist for EPT lifestyle of tools.
5. Q: If want technician to workshop to debug and instruct, how to do?
A: We despatched technician to your place to repair the EPT. Customer should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round excursion ticket and suited accommodation, also purchaser need to pay out the wage one hundred USD/working day.

