
makes certain the stability and consistency of the important operate of components. EPG will often adhere to it company spirit of being useful, modern, efficient and exceptional to make the leading worldwide transmission generate. In the meantime, our goods are made according to high top quality requirements, and complying with the worldwide superior standard criteria. Solution description of Africa employed big corrugated roof glazed tile roll forming EPT
Glazed tile roll forming EPT is a single of our main merchandise, it is more and much more well-liked in recent years due to the fact it truly is stunning in look amp EPT in style. We are a extremely skilled company of glazed tile roll forming EPT, with experienced technique and far more than 23 years’ expertise, our EPTs have been despatched to many nations around the world all about the entire world and received a good status for us.
This kind of EPT is very well-known and frequent used in current many years
비슷한 EPT를 찾으신다면 아마 마음에 드실 겁니다:
업무 수행 방식
The full line incEPTs decoiler, forming EPT, pc controlling method and run out tables. Our EPTs are equipped with a pc managing system to keep goods accurate.
Main parameter
아니요 | 유형 | 사양 | |
하나 | 원료 | 다양성 | PPGI |
| Feeding materials width | 914/a thousand/1200/1220/1250 mm | ||
| 두께 | 0.3~0.8mm 또는 고객 요청에 따라 | ||
2 | 디코일러 | 작업 | 안내서 |
| WeigEPT 용량 | 5톤 | ||
삼 | 주요 기관 | 롤러 스테이션 | 13 row |
| 샤프트의 직경 | 75mm | ||
| 샤프트 재질 | 0.05mm 크롬 도금이 된 45# | ||
| 롤러 콘텐츠 | 0.05mm 크롬 도금된 45# | ||
| 유형 | EPT 품종 | ||
| 몸 | 350mm C형 빔 | ||
| Body thickness | 16mm | ||
| EPT | Cr 12 | ||
| 절차 | EPT 컴퓨터화 | ||
| 작동 속도 | Common three-5 m/min and servo motor 6-10m/min | ||
4 | EPT | 운전로 | one.two inch EPT |
| 주 모터 | 5.5KW | ||
| EPT 역 EPT | 7.5 KW | ||
| 전압 | 380V/50Hz, 3단 | ||
5 | Control box | 전기로 작동하는 상자 | PLC management system, invEPTr |
| PLC 브랜드 | EPTiwan에서 만들어진 Delta | ||
| 인버터 제조업체 | EPTiwan에서 제작된 Delta | ||
| 언어 | EPT와 EPT | ||
가이드 디코일러
It is passive variety could load coil by expend the blots repair at coil inner diameter. It truly is effortless to function and inexpensive resolution.
서호(西湖) Dis.hu (서호) Dis. 단위
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to control the width and position of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the correct placement and handed to the roll forming program. Can adjust the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT placement. It is fixed framework to make confident can not go simply.
롤 성형 프로그램:
Roll forming system consist of EPT body, EPT method, EPT motor and roll forming method.
A. EPT frame adopts welding composition with shot blasting and painting remedy
B. All rollers material adopt substantial high quality No. forty five steel, with challenging chrome coated on surface area, all remedy by complete CNC EPTs, to make confident the rollers with great rigidity and precision, and sort excellent roofing sheet as for every design and style.
C. All rolling shafts are produced by substantial quality No. forty five metal with quench and mood treatment method, so the shafts with great rigidity which could use for EPT tern without having deformation.
D. Rolling shafting supporting structure type is metal wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the back/EPT roller EPTn by EPT, component of higher/reduced rollers EPTn by EPT
F. Change the screw bar manually to alter the distance amongst upper/lower rollers for variation thickness of sheet.
(Interest: all rolling method has altered in our firm as a ideal circumstance, we do not advise to modify the rollers at random, if needed, should adjust by a experienced technician or soon after teach by our engineer. In any other case will cause the EPT can not form a good profile
Cutting device
A. Adopts post slicing, the chopping blade substance is Cr12 with quenched treatment method, following cutting, there is no substance wasted.
B. Adopts welded frame for great rigidity.
C. The cutting action is droved by the EPT from EPT station which guarantees the procession of the chopping and minimal noisy, EPT life.
EPT 기법
It is controlled by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the reducing job.
The technique incEPTs a set of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
오일 펌프의 EPT: 3kW
EPT 오일: 40#
PLC control program
It adopts EPT personal computer to management. The target piece’s size is adjustable and digit of it can be modified. Computed method has two modes: computerized and manual a single. The program is simple to run and use.
Processing precision: inside of one.00mm
It contains liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of each element. Touch EPT
PLC는 EPTiwan Panasonic입니다.
변환기 브랜드명은 EPTiwan Delta입니다.
판매자는 EPT와 EPT 언어 EPT를 제공해야 합니다.
계수기
A single counter gauges duration, pulses, and decides duration.
단계 수행
To check out EPT video clip or far more information, get in touch with with me
저희 EPT는 수많은 해외 지역에 서비스를 제공합니다.
저희 인증
회사 정보
EPT group is a skilled producer creating and making roll forming EPTs estabEPTd in 1996년 6월우리는 가지고 있습니다. 네 개의 공장 functioning in BeiEPTg, TianEPT and ZheJiang province. More than 400 workers give provider for u.
EPT mainly incEPT trapezoidal metal roof/wall panel EPT, C ampZ form purline EPT, highway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, reducing EPT, downpipe EPT, gutter EPT, and so forth.
저희에게 오시는 방법은 무엇인가요?
저희 공급업체
1. Totally free technical help and totally free add-ons provide.
2. Engineer obtainable to services EPTry overEPT.
3. 1년 품질 보증이 제공됩니다.
4. EPT existence complex advice for free of charge.
5. We alwaEPToffer specialized support, quick reaction, all your inquire will be replied in 24 hours.
Concern amp Reply
1. Q: How to visit our organization:
A: Fly to BeiEPTg Airport: By fast train From BeiEPTg South station to HangEPT west station
(1hour), then we can choose up you to factory(40min).
B: Fly to ZheJiang Airport: By rapidly prepare From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(4.five several hours), then we can select up you to manufacturing facility(40min).
2. Q: What need to I give if I want to tailored EPT?
A: U require supply profile drawing, materials, thickness, voltage and your EPT demands.
3. 질문: 보증 내용은 무엇인가요?
A: 12개의 마운트 내부에는 모든 기술 장비가 완벽하게 갖춰져 있어 언제든지 고객님을 위해 서비스를 제공할 준비가 되어 있습니다.
4. 질문: EPT가 고장 나면 어떻게 해야 하나요?
A: Our EPT’s warranty period is twelve months, if the broken parts can’t mend, we will ship
new parts replace the broken components free, but you want spend the convey EPT if soon after guarantee period. we can negotiate to remedy the problem, and we provide the technical assist for EPT lifestyle of tools.
5. Q: If want technician to workshop to debug and instruct, how to do?
A: We despatched technician to your place to repair the EPT. Customer should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round excursion ticket and suited accommodation, also purchaser need to pay out the wage one hundred USD/working day.

