在印度尼西亚萨马林达的销售 价格 店铺 我附近 我附近的商店 工厂 供应商 宇发自动800型金属屋面琉璃瓦辊压成型机制造商 最好的 成本 风俗 便宜的 批发商

  in Samarinda Indonesia  sales   price   shop   near me   near me shop   factory   supplier Yufa Automatic 800 Metal Roof Glazed Tile Roll Forming Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

we are confident to give our customers flexible and diversified solutions. In 2008, it was awarded with “National Export Commodity Inspection-cost-free Company”. Hangzhou EPG Co.,Ltd. , was founded in November, 1997. With its five wholly owned subsidiaries.

Solution description of Yufa computerized 800 steel roof glazed tile roll forming EPT
Glazed tile roll forming EPT is one particular of our major items, it is a lot more and far more well-liked in modern a long time simply because it truly is gorgeous in physical appearance amp EPT in design and style. We are a extremely expert manufacturer of glazed tile roll forming EPT, with experienced approach and much more than 23 years’ experience, our EPTs have been sent to numerous international locations all all around the entire world and acquired a very good status for us.
This sort of EPT is very common and typical employed in recent many years

Related EPT possibly u like:

运作过程

The total line incEPTs decoiler, forming EPT, computer managing method and operate out tables. Our EPTs are geared up with a computer controlling technique to preserve products precise.

主要参数

种类

规格

Raw substance种类PPGI
进料内容宽度914毫米
厚度.14-.3 mm or as customer’s request

开卷机手术手动的
WeigEPT 能力5吨

3

Primary entire body滚筒站12 row
轴的直径75毫米
轴质45#,带0.05毫米镀铬层
辊筒材料45#,带0.05毫米镀铬层
类型EPT品种
身体350毫米C型梁
身体厚度十六毫米
EPTCr 12
程序EPT计算机化
Operating velocityCommon 3-five m/min and servo motor 6-10m/min

4

EPT行车道one.2 inch EPT
Primary motor5.5千瓦
EPT 站 EPTseven.five KW
电压380V/50HZ,三周期

5

Manage box电箱PLC处理技术,invEPTr
PLC品牌名称Delta 由 EPTiwan 创建
Inverter modelDelta 由 EPTiwan 创建
语言EPT 和 EPT

开卷机手册
It is passive kind could load coil by expend the blots resolve at coil internal diameter. It really is effortless to operate and affordable solution.
西湖 (XiHu) Dis.hu (West Lake) Dis. unit
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to manage the width and placement of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the correct placement and passed to the roll forming program. Can change the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT situation. It is fastened framework to make certain can not go simply.
辊压成型法:
Roll forming system consist of EPT frame, EPT program, EPT motor and roll forming technique.
A. EPT body adopts welding framework with shot blasting and painting treatment
B. All rollers content undertake high top quality No. 45 steel, with hard chrome coated on floor, all therapy by complete CNC EPTs, to make sure the rollers with great rigidity and precision, and sort best roofing sheet as per layout.
C. All rolling shafts are created by higher high quality No. forty five steel with quench and temper therapy, so the shafts with great rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting structure variety is metal wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT speed EPT motor EPTn, the again/EPT roller EPTn by EPT, element of upper/lower rollers EPTn by EPT
F. Change the screw bar manually to change the length in between higher/lower rollers for distinction thickness of sheet.
(Attention: all rolling method has altered in our business as a perfect circumstance, we will not propose to change the rollers at random, if required, should alter by a experienced technician or right after practice by our engineer. In any other case will cause the EPT can not sort a great profile
Cutting gadget
A. Adopts publish reducing, the slicing blade content is Cr12 with quenched treatment method, soon after cutting, there is no materials squandered.
B. 采用焊接结构,刚性非常好。
C. The chopping action is droved by the EPT from EPT station which ensures the procession of the reducing and reduced noisy, EPT daily life.
EPT Technique
It is controlled by EPT wheel oil pump. After filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the chopping job.
该项目包括一套EPT储罐、一套EPT油泵、两根EPT管道和两套电磁阀。
油泵EPT:3千瓦
EPT油:4#
PLC control technique
It adopts EPT computer to manage. The focus on piece’s duration is adjustable and digit of it can be altered. Computed manner has two modes: automatic and handbook 1. The method is straightforward to function and use.
Processing precision: inside of one.00mm
It consists of liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of each element. Contact EPT
PLC是EPTiwan Panasonic
Transducer brand is EPTiwan Delta
The vendor must supply EPT and EPT language EPT
柜台
One counter gauges size, pulses, and decides length.

Operate methods

To check EPT online video or more specifics, speak to with me

We EPT offer to plenty of countries

我们的认证

公司数据

EPT team is a professional maker creating and generating roll forming EPTs estabEPTd in 1996年6月我们有 四家工厂 working in BeiEPTg, TianEPT and ZheJiang province. Far more than 400 employees supply provider for u.
EPT primarily incEPT trapezoidal metal roof/wall panel EPT, C ampZ shape purline EPT, freeway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat doorway forming EPT, cutting EPT, downpipe EPT, gutter EPT, and so on.

How to check out us?

我们的支持

one. Free complex support and free of charge add-ons supply.

two. Engineer offered to provider EPTry overEPT.

3. A single year guarantee is presented.

4. EPT existence technical direction for free.

5. We alwaEPToffer technical assistance, rapid response, all your inquire will be replied in 24 hours.

Concern amp Response

one. Q: How to check out our company:

A:飞往北港机场:乘坐火车从北港南站到杭爱捷运西站快速到达

(1小时),然后我们可以带您去生产单位(40分钟)。

B: Fly to ZheJiang Airport: By rapidly prepare From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west

station(4.five hrs), then we can decide up you to manufacturing unit(40min).

2. Q: What ought to I give if I want to customized EPT?

A: U need provide profile drawing, materials, thickness, voltage and your EPT requirements.

3. Q: What is the Warranty?

A: Within 12 mounts, all technicals are ready to serve you at any time.

4. 问:如果EPT出现故障,该怎么办?

A: Our EPT’s warranty time period is twelve months, if the broken components can not mend, we will send out

new parts exchange the damaged components cost-free, but you need pay the categorical EPT if following guarantee time period. we can negotiate to resolve the issue, and we supply the technological assist for EPT daily life of gear.

5. Q: If need technician to workshop to debug and instruct, how to do?

A: We sent technician to your region to repair the EPT. Purchaser should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round vacation ticket and suited accommodation, also customer must spend the salary 100 USD/working day.

  in Samarinda Indonesia  sales   price   shop   near me   near me shop   factory   supplier Yufa Automatic 800 Metal Roof Glazed Tile Roll Forming Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Samarinda Indonesia  sales   price   shop   near me   near me shop   factory   supplier Yufa Automatic 800 Metal Roof Glazed Tile Roll Forming Machine manufacturer   best   Cost   Custom   Cheap   wholesaler