
Every single procedure, each and every area, every single operate in EPG is demanded to be done a single phase adhering to another, carefully and cautiously, from substance choice, reformation to producing accessories, from components heat remedy to automatic assembly, from quality manage to merchandise inspection and testing and from purchase working to after income provider. we offer chromed bar and tubes for hydualic and pheumatic cylinders. We supply OEM services. Solitary Beam Bridge solOverhead Crane
Fundamental Knowledge of one beam bridge crane colon
Crane Capacity lparlifting Fat rpar colon one~20ton semi
Span colon 7 period5~22 period5m
EPTT solhook peak colon 6~30m
Operating responsibility lparclassification rpar colon A3
Principal Composition amp Functions
Crane Beam colon
Weld by metal plate and I steel to make a reduced EPTT weigEPTT and higher diploma rigidity period of time Tiny wheel hundreds can be transmitted to the crane runway period
EPTTs colon
Steady starting up comma reversing and braking interval Insulation course is F and IP54 safety for hoisting comma CT amp LT motions period
Gear Box colon
The helical solspur EPTT for smooth procedure and EPTT daily life interval Gear and pinion colon Hardness colon 250~350BHN lparcarbon alloy steel rpar semi Antifriction sort ball solroller bearings with constant splash lubrication interval
Wheels colon
Selfmade wheels in the EPTT EPTT casting workshop lparno sand inclusion technic rpar comma which helps make the wheels far more elastic and outer surface area challenging
Putting on and tough period
EPT Panel colon
Modular layout semi Ease to set up and keep semi Trustworthy operation semi Fuse much less circuitry comma ducted wiring and compact terminals period
Restrict Switch colon
Basic safety restrict switches for stoppers to avert more than travelling in all motions period of time
Приложение
With functions of ligEPTT framework and simple set up comma it is broadly utilised to lift supplies in factories comma warehouses comma stockyards and other spots period of time DO NOT use in the surroundings with inflammable comma explosive and corrosive media period Its span is 7 period5~22 period5m lparNon-stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd deign can be accomplished according to the person aposs demands period rpar comma and the doing work temperature is -25~forty
What sort of product can be supplied for you quest
one rpar High EPTT and Best Price
EPTT Nicely-recognized EPTTmark —— quotKUANGEPTT quot
EPTTful EPTT Assist—–EPTT cEPTTr of Engineering and EPTT of EPTTing and Transport EPTTry of HangEPTT City
Numerous EPTT Certifications—- ISO9001-2008 semi ISO14001 colon 2004 semi CE semi GOST semi SGS semi BV semi TUV semi
EPTT forges brand name semi Integrity builds EPTT period We Promise to you the EPTT with Leading EPTT and Very best Price tag period of time
two rpar Security
Every Layout is for Your Personnel and Manufacturing facility excl
Protection Gadget for WeigEPTT overload
Leading EPTT EPTTurethane Buffer
Travelling and EPTT Limit Change
Voltage Lost Safety
Unexpected emergency Stop Technique to Shield Workers and Appropriate Home interval
Current Overload Defense Purpose period
Period Protection Perform
3 rpar EPTT Operation and EPTT Working Existence
With the EPTT EPTT and careful creation comma the cranes or spare components supplied will be operated easily and have considerably less maintenance in orEPTTto Help save Time and Expense excl
4 rpar Perfect Following-sale Provider
Shopper-oriEPTTd Idea
Specialist Pre-sales and Right after-revenue Team
Soon after-revenue Data Community
Free Service Presented During 3 Ensures apos Time period
Preferential Services Outside of the Period
Timely comma Critical and Full Service
We can manufacture items in accordance to your needs period of time If required comma make sure you advise us the pursuing info colon
A rpar EPTT capability solweight
B rpar Span
C rpar EPTT height
D rpar Working situations
E rpar Other EPTT specifications
Any concerns comma remember to feel totally free to make contact with us and we will be of support to you excl
Welcome to ZheJiang EPTT Crane Co period of time comma Ltd time period excl
| EPTT capability lparT rpar | one comma 2 comma three comma five comma 10T | sixteen comma 20T | |||||||||||
| Span lparM rpar | 7 period5-22 period5M | ||||||||||||
| Crane touring mechanism | Touring velocity lparm solmin rpar | 20 | 30 | 45 | шестьдесят | 75 | двадцать | тридцать | сорок пять | шестьдесят | семьдесят пять | ||
| соотношение ЭПТТ | 58 period78 | 39 period38 | 26 period36 | 19 period37 | 15 period88 | 58 period78 | 39 period38 | 26 period36 | 19 period37 | fifteen period88 | |||
| ЭПТТ | Дизайн | ZDY21-4 | ZDY21-4 | ZDY122-4 | ZDY131S-4 | ZDY112L1-4 | |||||||
| EPTT lparkw rpar | 2 instances period8 | two instances 1 period5 | 1 period5 instances 2 | 2 period2 occasions 2 | 2 period2 moments two | ||||||||
| Rotation lparm solmin rpar | 1380 | 1380 | |||||||||||
| EPTT system lparelectric hoist rpar amp electric powered hoist touring system | Electric hoist product | CD1 solMD1 | MD1 solHC | ||||||||||
| EPTT pace lparm solmin rpar | eight comma eight sol0 period8 7 comma 7 sol0 period7 | three period5 3 period5 sol0 period35 | |||||||||||
| EPTT heigEPTT lparm rpar | six comma nine comma twelve comma eighteen comma 24 comma 30 | twelve comma 18 comma 24 comma 30 | |||||||||||
| Traveling velocity lparm solmin rpar | twenty lpar30 rpar | 20 lpar30 rpar | |||||||||||
| ЭПТТ | EPTTper Squirrel-cage sort | EPTTper Squirrel-cage sort | |||||||||||
| Work duty | A3-A5 | ||||||||||||
| EPTT supply | 380V 50HZ a few section | ||||||||||||
| Wheel diameter | 270mm | 370mm | |||||||||||
| Width of path | 37-70mm | 37-70mm | |||||||||||

