
In 2000, EPG took the direct in gaining ISO14001 atmosphere administration certification and thereafter handed the inspection of clear production and recycling economic climate, successful the title of “Zhejiang Environmentally friendly Enterprise”. Our AdvantagesProducts Big volume in Stock, No MOQ essential We comply with all the international standards, this sort of as ISO9001 and TS16949 specifications. specialize in power transmission merchandise, CATV items, mechanical seal, hydraulic and Pheumatic, and advertising items.
Solution description of 1100 Roof panel stage tile roll forming EPT value
Glazed tile roll forming EPT is one of our major products, it is more and more popular in recent several years due to the fact it’s gorgeous in visual appeal amp EPT in style. We are a really professional company of glazed tile roll forming EPT, with experienced strategy and a lot more than 23 years’ encounter, our EPTs have been sent to several countries all about the entire world and received a good popularity for us.
This kind of EPT is quite well-known and typical employed in modern many years
Related EPT probably u like:
작동 방식
The total line incEPTs decoiler, forming EPT, computer managing program and run out tables. Our EPTs are equipped with a personal computer managing method to keep products exact.
Primary parameter
아니요 | 종류 | 사양 | |
1 | 원료 | 다양성 | PPGI |
| 사료 물질 너비 | 1250mm | ||
| 두께 | .3-.eight mm or as customer’s request | ||
둘 | 디코일러 | 작업 | 안내서 |
| WeigEPT 용량 | 5톤 | ||
3 | Primary human body | 롤러 스테이션 | 12줄 |
| 샤프트의 직경 | 75mm | ||
| 샤프트 내용 | 0.05mm 크롬 도금이 된 45# | ||
| Roller substance | 0.05mm 크롬 도금이 된 45# | ||
| 친절한 | EPT 유형 | ||
| 액자 | 350mm C형 빔 | ||
| 프레임 두께 | 16mm | ||
| EPT | Cr 12 | ||
| 절차 | EPT 자동화 | ||
| Doing work pace | 광범위하게 3-5m/분 서보 모터 6-10m/min | ||
4 | EPT | 운전로 | 1.two inch EPT |
| 주요 모터 | 5.5kW | ||
| EPT 역 EPT | 7.5 KW | ||
| 전압 | 380V/50HZ, three period | ||
다섯 | Management box | 전기 상자 | PLC 관리 방법, invEPTr |
| PLC 제조업체 | EPTiwan에서 만들어진 Delta | ||
| Inverter brand | EPTiwan에서 제조된 Delta | ||
| 언어 | EPT와 EPT | ||
가이드 디코일러
It is passive kind could load coil by expend the blots correct at coil internal diameter. It is simple to function and inexpensive solution.
서호(西湖) Dis.hu (서호) Dis. 단위
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and place of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the correct placement and passed to the roll forming program. Can alter the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT placement. It’s fixed structure to make sure can not transfer simply.
롤 성형 방식:
Roll forming technique consist of EPT body, EPT method, EPT motor and roll forming program.
A. EPT body adopts welding structure with shot blasting and painting treatment method
B. All rollers material undertake high quality No. forty five steel, with hard chrome coated on surface, all treatment by entire CNC EPTs, to make sure the rollers with very good rigidity and precision, and form excellent roofing sheet as for every design.
C. All rolling shafts are produced by large high quality No. forty five steel with quench and mood therapy, so the shafts with excellent rigidity which could use for EPT tern without deformation.
D. Rolling shafting supporting framework kind is steel wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the back again/EPT roller EPTn by EPT, portion of upper/decrease rollers EPTn by EPT
F. Adjust the screw bar manually to alter the distance in between higher/reduced rollers for difference thickness of sheet.
(Consideration: all rolling program has adjusted in our firm as a ideal circumstance, we do not recommend to modify the rollers at random, if essential, should adjust by a skilled technician or right after prepare by our engineer. Normally will cause the EPT can not sort a very good profile
Cutting gadget
A. Adopts publish reducing, the cutting blade substance is Cr12 with quenched treatment, after slicing, there is no substance squandered.
B. Adopts welded body for good rigidity.
C. The chopping action is droved by the EPT from EPT station which assures the procession of the cutting and reduced noisy, EPT daily life.
EPT Program
It is controlled by EPT wheel oil pump. Soon after filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the slicing job.
The system incEPTs a established of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
오일 펌프의 EPT: 3kW
EPT 오일: 40#
PLC control method
It adopts EPT laptop to handle. The concentrate on piece’s duration is adjustable and digit of it can be altered. Computed mode has two modes: automated and handbook one particular. The program is easy to operate and use.
가공 정밀도: 1.00mm 이내
It consists of liquid crystal EPT, programmer, transformer for the digital EPTs and kits of every element. Contact EPT
PLC는 EPTiwan Panasonic입니다.
변환기 브랜드명은 EPTiwan Delta입니다.
판매자는 EPT와 EPT 언어 EPT를 제공해야 합니다.
계수기
One particular counter gauges size, pulses, and decides length.
Work methods
To check EPT video clip or a lot more information, contact with me
We EPT offer to lots of nations around the world
저희 인증서
비즈니스 데이터
EPT team is a specialist company creating and creating roll forming EPTs estabEPTd in 1996년 6월우리는 가지고 있습니다. 4개의 공장 working in BeiEPTg, TianEPT and ZheJiang province. A lot more than four hundred workers offer support for u.
EPT primarily incEPT trapezoidal steel roof/wall panel EPT, C ampZ form purline EPT, highway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, slicing EPT, downpipe EPT, gutter EPT, etc.
저희를 방문하려면 어떻게 해야 하나요?
Our services
1. Cost-free complex help and cost-free equipment offer.
two. Engineer available to support EPTry overEPT.
three. 1 yr warranty is provided.
four. EPT life technological direction for free.
5. We alwaEPToffer complex support, quick response, all your inquire will be replied in 24 hrs.
Question amp Answer
1. Q: How to visit our firm:
A: Fly to BeiEPTg Airport: By rapidly train From BeiEPTg South station to HangEPT west station
(1hour), then we can pick up you to manufacturing unit(40min).
B: 저장성 공항으로 비행: 저장성 서호(西湖)역에서 항만 EPT 서쪽역까지 고속 열차 이용
station(four.five hours), then we can decide up you to manufacturing unit(40min).
2. Q: What ought to I supply if I want to personalized EPT?
A: U need to have provide profile drawing, content, thickness, voltage and your EPT needs.
3. Q: What is the Warranty?
A: In twelve mounts, all technicals are prepared to provide you at any time.
four. Q: What can you do if the EPT broken?
A: Our EPT’s guarantee interval is twelve months, if the damaged areas can not fix, we will send out
new parts replace the damaged components totally free, but you require shell out the categorical EPT if soon after warranty period of time. we can negotiate to fix the problem, and we source the technical assist for EPT life of products.
five. Q: If need technician to workshop to debug and educate, how to do?
A: We despatched technician to your nation to fix the EPT. Buyer should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical vacation ticket and ideal lodging, also purchaser must pay the income 100 USD/day.

