
In 2000, EPG took the direct in gaining ISO14001 atmosphere administration certification and thereafter handed the inspection of clear production and recycling economic climate, successful the title of “Zhejiang Environmentally friendly Enterprise”. Our AdvantagesProducts Big volume in Stock, No MOQ essential We comply with all the international standards, this sort of as ISO9001 and TS16949 specifications. specialize in power transmission merchandise, CATV items, mechanical seal, hydraulic and Pheumatic, and advertising items.
Solution description of 1100 Roof panel stage tile roll forming EPT value
Glazed tile roll forming EPT is one of our major products, it is more and more popular in recent several years due to the fact it’s gorgeous in visual appeal amp EPT in style. We are a really professional company of glazed tile roll forming EPT, with experienced strategy and a lot more than 23 years’ encounter, our EPTs have been sent to several countries all about the entire world and received a good popularity for us.
This kind of EPT is quite well-known and typical employed in modern many years
Related EPT probably u like:
Functioning method
The total line incEPTs decoiler, forming EPT, computer managing program and run out tables. Our EPTs are equipped with a personal computer managing method to keep products exact.
Primary parameter
لا | نوع | مواصفة | |
1 | Raw material | متنوع | PPGI |
| Feeding substance width | 1250 mm | ||
| سماكة | .3-.eight mm or as customer’s request | ||
اثنين | فك اللفائف | عملية | كتيب |
| سعة WeigEPT | 5 Tons | ||
3 | Primary human body | محطة بكرات | twelve row |
| قطر العمود | 75 ملم | ||
| Shaft content | 45# مع 0.05 مم من الكروم | ||
| Roller substance | 45# مع 0.05 مم من الكروم | ||
| عطوف | EPT type | ||
| إطار | عارضة على شكل حرف C بطول 350 مم | ||
| سمك الإطار | 16 مم | ||
| EPT | Cr twelve | ||
| إجراء | EPT آلي | ||
| Doing work pace | Widespread three-5 m/min Servo motor 6-10m/min | ||
4 | EPT | طريق القيادة | 1.two inch EPT |
| Major motor | 5.5 كيلوواط | ||
| محطة EPT EPT | 7.5 كيلوواط | ||
| الجهد االكهربى | 380V/50HZ, three period | ||
خمسة | صندوق الإدارة | صندوق كهربائي | PLC management method, invEPTr |
| شركة تصنيع وحدات التحكم المنطقية القابلة للبرمجة (PLC) | تم إنشاء دلتا في EPTiwan | ||
| Inverter brand | دلتا مصنعة في إثيوبيا وتايوان | ||
| لغة | EPT و EPT | ||
دليل فك اللفائف
It is passive kind could load coil by expend the blots correct at coil internal diameter. It is simple to function and inexpensive solution.
XiHu (West Lake) Dis.hu (West Lake) Dis. unit
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and place of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the correct placement and passed to the roll forming program. Can alter the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT placement. It’s fixed structure to make sure can not transfer simply.
طريقة تشكيل اللفائف:
Roll forming technique consist of EPT body, EPT method, EPT motor and roll forming program.
A. EPT body adopts welding structure with shot blasting and painting treatment method
B. All rollers material undertake high quality No. forty five steel, with hard chrome coated on surface, all treatment by entire CNC EPTs, to make sure the rollers with very good rigidity and precision, and form excellent roofing sheet as for every design.
C. All rolling shafts are produced by large high quality No. forty five steel with quench and mood therapy, so the shafts with excellent rigidity which could use for EPT tern without deformation.
D. Rolling shafting supporting framework kind is steel wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the back again/EPT roller EPTn by EPT, portion of upper/decrease rollers EPTn by EPT
F. Adjust the screw bar manually to alter the distance in between higher/reduced rollers for difference thickness of sheet.
(Consideration: all rolling program has adjusted in our firm as a ideal circumstance, we do not recommend to modify the rollers at random, if essential, should adjust by a skilled technician or right after prepare by our engineer. Normally will cause the EPT can not sort a very good profile
Cutting gadget
A. Adopts publish reducing, the cutting blade substance is Cr12 with quenched treatment, after slicing, there is no substance squandered.
B. Adopts welded body for good rigidity.
C. The chopping action is droved by the EPT from EPT station which assures the procession of the cutting and reduced noisy, EPT daily life.
برنامج EPT
It is controlled by EPT wheel oil pump. Soon after filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the slicing job.
The system incEPTs a established of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
القدرة الكهربائية لمضخة الزيت: 3 كيلوواط
زيت EPT: 40#
طريقة التحكم PLC
It adopts EPT laptop to handle. The concentrate on piece’s duration is adjustable and digit of it can be altered. Computed mode has two modes: automated and handbook one particular. The program is easy to operate and use.
دقة المعالجة: في حدود 1.00 مم
It consists of liquid crystal EPT, programmer, transformer for the digital EPTs and kits of every element. Contact EPT
شركة PLC هي شركة باناسونيك التايوانية
اسم العلامة التجارية للمحول هو EPTiwan Delta
The vendor must supply EPT and EPT language EPT
عداد
One particular counter gauges size, pulses, and decides length.
Work methods
To check EPT video clip or a lot more information, contact with me
We EPT offer to lots of nations around the world
Our certificate
بيانات الأعمال
EPT team is a specialist company creating and creating roll forming EPTs estabEPTd in يونيو 1996لدينا 4 factories working in BeiEPTg, TianEPT and ZheJiang province. A lot more than four hundred workers offer support for u.
EPT primarily incEPT trapezoidal steel roof/wall panel EPT, C ampZ form purline EPT, highway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, slicing EPT, downpipe EPT, gutter EPT, etc.
How to pay a visit to us?
خدماتنا
1. Cost-free complex help and cost-free equipment offer.
two. Engineer available to support EPTry overEPT.
three. 1 yr warranty is provided.
four. EPT life technological direction for free.
5. We alwaEPToffer complex support, quick response, all your inquire will be replied in 24 hrs.
Question amp Answer
1. Q: How to visit our firm:
A: Fly to BeiEPTg Airport: By rapidly train From BeiEPTg South station to HangEPT west station
(1hour), then we can pick up you to manufacturing unit(40min).
B: Fly to ZheJiang Airport: By rapidly teach From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.five hours), then we can decide up you to manufacturing unit(40min).
2. Q: What ought to I supply if I want to personalized EPT?
A: U need to have provide profile drawing, content, thickness, voltage and your EPT needs.
3. Q: What is the Warranty?
A: In twelve mounts, all technicals are prepared to provide you at any time.
رابعاً: س: ماذا يمكنك أن تفعل إذا تعطل جهاز EPT؟
A: Our EPT’s guarantee interval is twelve months, if the damaged areas can not fix, we will send out
new parts replace the damaged components totally free, but you require shell out the categorical EPT if soon after warranty period of time. we can negotiate to fix the problem, and we source the technical assist for EPT life of products.
five. Q: If need technician to workshop to debug and educate, how to do?
A: We despatched technician to your nation to fix the EPT. Buyer should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical vacation ticket and ideal lodging, also purchaser must pay the income 100 USD/day.

