
Wonderful focus has been paid on environmental safety and power saving. EPG has established up a comprehensive set of quality management method which is provided with superior inspection and check gear. Our product range includes all types of helical equipment, spur gear, bevel gear, gear rack, worm equipment, sprockets,chains, bearings. R/F/K/S PXiHu (West Lake) Dis.Hu (West Lake) Dis.lel Shaft Gear Box Velocity EPTT for Raking EPTT Raking EPTT
機能:
one. Compact construction and basic assembly
two. Broad velocity ranges and higher torque
three. Low sound, excellent sealing efficiency, higher effectiveness
4. Steady and secure, EPTT life time, EPTT
five. Multi-composition, different assembling strategies
Solution photo:
仕様:
| ANG Helical Gear EPTT | |
| モデル | R17 ~ 187, F37-177, K37-187, S37-ninety seven |
| 入力EPTT | .06kw ~ 250kw |
| Enter pace | 750rpm~3000rpm |
| 削減率 | one/one.three ~ 1/27000 |
| 入力モーター | AC (1 stage or 3 stage) / DC / BLDC motor |
| Set up variety | Foot / Sound shaft / Hollow shaft / Output flange #8230 |
| 効果 | 94% ~ ninety eight % for R F K sequence |
| EPTT of housing | die-forged EPTT / Solid iron / Stainless steel |
| EPTT of EPTT | Exact grinding, course 6 |
| Warmth treatment | Carburizing and quenching |
| アクセサリー | Brake / Flange / EPTT adapter / Torque arm #8230 |
よくある質問
Q: Can you make the EPTT motor with customization?
A: Sure, we can personalize for each your ask for, like EPTT, voltage, velocity, shaft measurement, flange, terminal box, IP quality, and so forth.
Q:サンプルは提供していますか?
A: Yes. Sample is offered for testing.
Q:最小注文数量(MOQ)はいくつですか?
A: It is 1pcs for the commencing of our organization.
Q: What is your lead time?
A: StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd product need to have 5-30days, a little bit EPTTer for EPT items.
Q: Do you give EPTT assistance?
A: Indeed. Our organization have design and style and deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment group, we can supply EPTT help if you
need to have.
Q:弊社への配送方法を教えてください。
A: It is obtainable by air, or by sea, or by train.
Q: How to shell out the income?
A: T/T and L/C is desired, with various currency, incXiHu (West Lake) Dis.Hu (West Lake) Dis. USD, EUR, RMB, and so on.
Q: How can I know the merchandise is suitable for me?
A: gt1ST verify drawing and specification gt2そして take a look at sample gt3rd start mass manufacturing.
Q: Can I arrive to your organization to visit?
A: Of course, you are welcome to go to us at any time.
Q:どのように連絡を取ればよいでしょうか?
A: You can send out inquiry directly, and we will respond within 24 hours.

