
Fantastic consideration has been paid on environmental defense and strength saving. In this way, our products have ongoing to gain market acceptance and customers pleasure in excess of the past handful of a long time. we supply chromed bar and tubes for hydualic and pheumatic cylinders.
Brief introduction of YZ sequence bridge foundy crane:
YZ bridge foundry crane with hook is mainlv employed at the olace exactly where the molten metal is lifted .
The operating class of the Complete EPTT is A7,and thermal-protecting coating is extra at the
bottom of the primary gider.The assembling and test of theCrane conform to the doc
No.ZJBT[ 2007]375 which was issued by ceneral Administration of EPTT Supervision ,Inspection
And Quarantine of the People’s Republic fo EPTT.The place exactly where molten nonmetal and purple-hot
strong metalis lifted also can refer To his document.(observe:HO in the be[ow determine is the increased
heigEPTT of buffer of the crane.HO le250).
使用法:
EPTT circumstances:
1.The EPTT of crane is three-phase ACRated frequency is 50Hz:Rated voltage is 380V
2.The temperature of operating environments is-10~ 60C
three.The specifications are more than above-described.It shall have out the requirements in the
puchase deal as the user asks. Buying recommendations:The standard parameters
(rated lifting bodyweight.Liting heigEPTT and span,and many others.)of the crane shall be explained cleat when the user orders merchandise
Or signs a deal so that the item which might fulfill the functioning situation cabe supplied.
Attributes:
one.Higher operating effiency
two.Smooth movement ampcomfortable procedure
3.Practical routine maintenance amp aesthetic portray
4.LigEPTT EPTTweight, ligEPTT wheel load and dependable efficiency
five.Personalized:Design and style and manufacture in accordance to your ask for.
EPTT day:
| EPTT Capability | T | 5 | 10 | ||||||||||||||||
| Span | M | ten.5 | 13.5 | sixteen.5 | 19.5 | 22.5 | 28.five | 31.five | ten.5 | 13.5 | sixteen.five | 19.five | 22.five | 25.five | 28.five | 31.five | |||
| EPTT Top | Major | M | sixteen.5 | 16歳 | |||||||||||||||
| ペース | EPTTing | M/min | fifteen.5 | ten.four | |||||||||||||||
| Crab travelling | 37.2 | forty three.eight | |||||||||||||||||
| Trolley travelling | ninety seven.two | 93.7 | 92.7 | 93.7 | 86.5 | ||||||||||||||
| EPTT | EPTTing | キロワット | 15 | 22 | |||||||||||||||
| Crab travelling | 1.5 | 2.2 | |||||||||||||||||
| Trolley travelling | 2 times5.5 | two times7.five | 2 times5.five | 2 times7.5 | |||||||||||||||
| MAX.Whee Loading | KN | 76 | 85 | 93 | 98 | 108 | 128 | 139 | 144 | 112 | 121 | 131 | 139 | 147 | 161 | 168 | 185 | ||
| EPTT EPTT | 3-Section A.C.50Hz 380V | 3-Period A.C.50Hz 380V | |||||||||||||||||
one.Electric areas are packed by large top quality plywood crate, to reduce distortion in conveying.
two. Main beams, conclude beams and trolly/winch are packed by plastic woven fabric.
It can reduce abrasion for the duration of the transportation.
three. If the dimension are appropriate for container ship, generally by container.
4. Large measurement, usually by bulk ship or by container after truncation.
five. Transportation waEPTTare based on reducing EPTT amp preserve safet
EPTT is l established in 1989, is the predecessor of HangEPTT Metropolis crane factory, restructuring in 2005.
In excess of the a long time EPTT ongoing to introduce domestic and international EPTT production EPTT,
take up the EPTTized, large-good quality specialists, EPTT strong technical force, EPTT process
equipment, has a professional engineering and technological personnel, very first-class installation group, outstanding
after sale services, and took the lead through the ISO9001 global top quality technique certification, with
impartial mental house rights and EPTT home rights.With ten collection above 60 kinds and
various non-stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd lifting gear creation capacity, solution promoting much more than 30 domestic provinces
and cities and more than 50 international locations and areas.
認証:
Our Provider:
Pre-EPTT Service
*Inquiry and consulting assist.
* Sample testing support.
* Check out our Manufacturing unit
After-EPTT Provider
*Coaching how to instal the EPTT
*Education how to use the EPTT.
*Engineers obtainable to services EPTTry overEPTT
よくある質問:
Q:Are you factory?
A:Yes, we are manufacturing unit with 31 a long time outdated.
Q:How EPTT is your guarantee?
Our warranty is 24 months soon after EPTTd the merchandise.
3.The use period.
About thirty several years unEPTTcommon use.
four.How can we install the crane?
Our senior engineer can be your aspect to do the installation XiHu (West Lake) Dis.Hu (West Lake) Dis. services and instruction.
If you want our merchandise, remember to contact with us ASAP!We will do our ideal for you!

