
Hangzhou EPG Co.,Ltd. , was started in November, 1997. With its five wholly owned subsidiaries. We are aiming to fulfill the calls for of the clientele close to the globe.. makes certain the balance and regularity of the essential operate of parts.
Item Description
EPT parameter
Web height: one hundred sixty-1500/1800/2000mm
Net thickness: 3-forty
Flange width: a hundred and sixty-800mm
Flange thickness: six-40mm
Workpiece length: 4000-20000mm
Assembly spped: .five-six m/min
Electrical assembly: the manufacturer is AC converter
Total EPT: 10KW
EPT source: AC 380V 50HZ 3phsaes
| Design | Z15 | Z18 | Z20 |
| web heigEPT mm | 200-1500 | two hundred-1800 | two hundred-2000 |
| web thickness mm | six-32 | ||
| world wide web duration mm | 4000-15000 | ||
| flange width mm | 200-800 | ||
| flange thickness mm | six-40 | ||
| assembly velocity mm/min | five hundred-6000 | ||
| feeding desk roller mm | 2600 times2 | ||
| output desk roller mm | 2600 times2 | ||
| centralized way | EPT website link mechanism clamp, centralize and weld in the middle automaticly | ||
| velocity control | EPTed AC frequency adjustor stepless change | ||
| input volumn | 16KVA Except wellding EPT | ||
| welding program | 2 sets of CO2 protecting welding EPT | ||
Z15 H beam assembly EPT
Construction Theory
This EPT is primarily composed of the adhering to components:
| 1. the major motor assembly, |
| two. pull rod on the program, |
| three. the enter roller, |
| four. output roller, |
| 5. EPT technique assembly, |
| six. electric powered control technique. |
The host assembly: the main parts of the primary incEPT:
| the main EPT roller (2 groups), |
| the net clamp method (two groups), |
| the wing plate clamping system (three teams), |
| lifting the primary compression beam, |
| H variety metal alignment component. |
a)the main EPT roller
b) internet clamping system
c) wing plate clamping method
d) main lifting compaction beam
e) H steel partly aligned
Rod on the system (two groups)
Enter and output rollers
EPT program assembly
*Suitable workpiece`s size:
| Net height | 200-1500mm |
| Net thickness | six-40mm |
| Flange width | one hundred sixty-800mm |
| Flange thickness | six-40mm |
| Workpiece size | 4000-15000mm |
| Assembly spped | .5-6 m/min |
| Electrical assembly: | the manufacturer is AC converter |
| Whole EPT | 10KW |
| EPT offer | AC 380V 50HZ 3phsaes customized |
Scope of source and composition
A.Group vertical EPT physique:
-the main motor assembly, internet clamp, flange plate clamping, and many others..
B.input and output roller assembly:
-roller of 2.6m/ * six festival competition, rod technique etc.
C.EPT system:
-pump station, oil motor, higher pressure hose, EPT cylinder, and so on..
D. automatic spot welding technique:
-350A CO2 welding EPT source*2pcs.welding, mechanical tracking system, the EPT cylinEPTclamping mechanism and many others. (handbook welding without having the equipment, computerized welding).
E.electric handle technique:
-electrical cupboard, AC inverter, and so forth..
F.spare areas:
-O button three. The HH54PDC24V relay two. The molten core 4A, each three 6A.
EPT paperwork
Guidelines for the use of the comprehensive EPT (incXiHu (West Lake) Dis.Hu (West Lake) Dis. the EPT theory diagram, EPT principle diagram, wearing parts record, and so on.)
Frequency converter employing manual, EPT pump station handbook
Delivery list
EPT qualification certification
Simple graph
Manufacturing and self owned portion
A. Basis (provided by the supplier).
B. anchor bolts and growth bolt.
C. EPT basis.

