
With several years’ encounter in this line, we will be dependable by our rewards in competitive cost, one particular-time shipping, prompt response, on-hand engineering assistance and great following-product sales solutions.Moreover, all our manufacturing processes are in compliance with ISO9001 standards. Each and every procedure, every part, each and every perform in EPG is demanded to be carried out a single phase adhering to one more, meticulously and cautiously, from content variety, reformation to producing equipment, from components heat remedy to computerized assembly, from quality handle to item inspection and screening and from purchase dealing to right after revenue services. EPG was awarded with “renowned solution of Zhejiang Province” and “renowned brand of Zhejiang Province”. Telescopic EPTT Maritime Crane
A telescopic offshore maritime crane makes it possible for you to have a EPTTer get to on a vessel. Currently being capable to retract the telescopic growth with outer telescopic EPTTes allows you to keep it less complicated on the deck of your vessel yielding a lot more area on the deck. EPT utilizes their telescopic boom maritime cranes on five of their elevate boats. Make the get to of your elevate with no compromising the area of your offshore offer vessel with GBM’s telescopic boom marine crane.
Fixed EPTT Marine Crane
A lot more affordable and easier to sustain, The set boom pedestal crane is more resilient and has much less moving components. The mounted growth pedestal crane is the perfect solution for stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd, regular lifting amp handling demands. A mounted increase maritime crane operates quicker and is mainly utilized to transportation groceries and more compact, more normal lifting amp dealing with functions.
EPTTNICAL Arrangement
1. EPTT
This agreement prepared in EPTT and EPTT language, should be according to EPTT language if contradiction accrue.
,,.
EPTT and content shall be according to the most recent stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds of BV Classification Culture established in force at the time when the contract is executed and the ship of the specification.
BV .
MANUFACTURE shall ensure the EPTT for a period of time of twelve months after the ship delivery.
بارہ
7 DaEPTTprior to store shipping test for the equipment, MANUFACTURE should notify SHIPYARD to go to the test and at the very same time submit the inspection/examination details to them.
seven ,/.
This arrangement shall become powerful on the day when the agreement has been duly executed.
,.
2. Simple technological specification
Classification Modern society: BV Navigation: unrestricted
:
two.2 Rule and Regulation: BV
2.3 Certificates needed
Marine goods certificate by course
Manufacture certification
2.four StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd: ISO GB CB
2.5 Temperature of environment: -100C—500C
two.6 EPTTmmended lubrication oil type for the gear: EPTTort
:
two.7 Nameplate: In EPTT
2.eight Painting:Floor disposal, brief blast to Sa two.five
: ,Sa2.five
EPTTr paint: 702 zinc epoxy prime 80 mu(dry)
: 702(eighty mu)
End paint: To be deterEPTTd stick to the ship operator later
:()
two.9 EPTT source: AC 440 V, 60 Hz, three Phi DC V
2.ten EPTT insulation course: F
two.eleven EPTT safety course: IP56
two.12 EPTT with cable gland: With
2.thirteen EPTT with earth bolt: With
two.fourteen EPTT with area heater: With
two.15 EPTT beginning technique: Y/ #9651 commence
Y/ #9651
2.sixteen EPTT in compliance with IEC requirement: Sure
آئی ای سی
2.seventeen EPTT components: Maker’s stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd
EPTT component box EPTT component record in box
three. Scope of drawing to be supplied
three.one Acceptance drawing: two Copies
three.two Functioning drawing (drawing modified in accordance to remarks): two Copies
()
three.3 Ultimate drawing: 2 Copies
3.4 Following the contract is executed, MANUFACTURE must submit the acceptance drawings to SHIPOWNER,SHIPYARD and DESIGNER inside of 10 days.
fifteen ,,.
Right after getting the acceptance drawing, SHIPOWNER,SHIPYARD and DESIGNER will return 1 copy of acceptance drawing with feedback. If SHIPOWNER,SHIPYARD and DESIGNER have not returned the acceptance drawings within 20 times, that means has no comments on the approval drawing.
,,one, twenty ,,,,.
MANUFACTURE need to post the functioning drawings to SHIPOWNER,SHIPYARD and DESIGNER within ten daEPTTafter obtaining the approval drawings returned.
, ten ,.
Final drawing need to be sent to SHIPYARD jointly with the products.
.
Drawings’ language: EPTT language EPTT amp EPTT language
() (,)
four. Articles of drawings as pursuing:
| نہیں | Title of drawing | Acceptance Drawing | کام کرنا Drawing | Last Drawing | Remarks |
| ایک | Instruction | ضرور | جی ہاں | جی ہاں | |
| 2 | Test plan | جی ہاں | بے شک | ضرور | |
| 3 | G.A | بالکل | بے شک | ضرور | |
| چار | EPTT system diagram | بے شک | ضرور | ضرور | |
| پانچ | Electric powered circuit diagram | جی ہاں | جی ہاں | جی ہاں | |
| 6 | Overall of electric powered control box | ضرور | جی ہاں | جی ہاں | |
| سات | EPTT areas listing | بالکل | جی ہاں | بالکل | |
| 8 | Factory Test report | بے شک | |||
| 9 | Factory certification | جی ہاں | |||
| دس | Course certification (LR) (LR) | بے شک |
5. EPTT parameters
SWL 2t
Max. operating radius eight.5m
Min. operating radius 2m
EPTTing speed ~7m/min() ~12m/min()
EPTTing top 20m
EPTT velocity ~.5r/min
EPTT angle 3600
Luffing time ~50s
Doing work condition
Trim le20
Heel le50
Elec-EPTT YB160M-4-H
EPTT 11kW
Velocity 1760r/min
EPTT Useful resource AC440V/60HZ
Begin Way Y/ #9651
Safeguard Quality IP56
Insulation Quality F
6. Scope of offer
.
6.one 2t/eight.5m EPTT swing crane: 6set (inc. Management box).
2t/8.5m:1().
six.two EPTT element ,this sort of as EPTT pump,EPTT motor,management valves use EPTTs , these factors have EPTT services network.
,,,,.()
7. Certification
MANUFACTURE is to offer BV certification.
BV .
8. After-income support
MANUFACTURE will cooperate with SHIPYARD in assembling and debugging.
,.
nine. Guarantee period
Incase these need to be any difficulty or damage on the gear which are due to the accountability to MANUFACTURE in guarantee period of 1 12 months after ship’s delivery ,MANUFACTURE will make the mend work for the damage part free of cost.
,,.
2t/eight.5m EPTT Crane
Scope of provide
| نہیں | عنوان | Qty. |
| ایک | ای پی ٹی ٹی | 1/ 1 established |
| 2 | operation system | one/ 1 established |
| 3 | EPTTing winch | one/ 1 set |
| 4 | Pedestal | one/ 1 established |
| پانچ | Luffing cylinder | 1/ 1sets |
| چھ | Upkeep platform | one/ 1 set |
| 7 | Hook | one/ 1 unit |
| 8 | Steel wire rope | one/ one unit |
| نو | Oil tank | 1/ 1 set |
| دس | EPTT device | one/ one unit |
| 11 | EPT management box | one/ 1 established |
EPTT areas list
| نہیں | identify | Qty |
| ایک | Higher pressure tube | 3/ three pcs |
| دو | EPTTt | three/ 3pcs |
| تین | Seal | three/ 3pcs |
| چار | Washer | 10/ 10pcs |
| 5 | quotO quot O-ring | 10/ 10pcs |
| 6 | Fuse | three/ 3pcs |
| 7 | Oil Cup | five/ 5pcs |
Primary fittings checklist
| نہیں | تفصیل | Maker | amount |
| 1 | الیکٹرک موٹر | HangEPTT EPTT EPT EPTTry Co.,Ltd | ایک |
| دو | EPTT pump | () Parker Hannifin Fluid EPTT Method and Factors ( ZheJiang ) Co,.Ltd | 1 |
| 3 | EPTTding valve | () Parker Hannifin Fluid EPTT Method and Factors ( ZheJiang ) Co,.Ltd | 1 |
| 4 | Functioning hand valve | () Parker Hannifin Fluid EPTT System and Parts ( ZheJiang ) Co,.Ltd | ایک |
| 5 | EPTT ring | ZheJiang NingGuo EPTTChang EPTT ring Co,.Ltd | ایک |
| 6 | EPTTing winch | ای پی ٹی ٹی | 1 |
| ای پی ٹی ٹی | ایک |
| ای پی ٹی ٹی | ایک |
| ای پی ٹی ٹی | 1 |
| ای پی ٹی ٹی | 1 |

