
If you need to have any info or samples, make sure you make contact with us and you will have our soon reply. Our AdvantagesProducts Huge volume in Inventory, No MOQ needed We comply with all the worldwide standards, this sort of as ISO9001 and TS16949 requirements. Owing to our sincerity in giving greatest service to our clientele, understanding of your wants and overriding sense of accountability toward filling ordering specifications,
Solution description of Omega profile roll forming EPT Omega hat channel truss furring EPT for Egypt
This Chilly metal roofing panel roll forming EPT is made by our specialists uEPTzing large quality ingredient. Steel type Roofing Panel has a stunning appearance and brigEPT colour. It is widely utilised in XiHu (West Lake) Dis.Hu (West Lake) Dis.den, manufacturing facility, resort, hotel, EPT hall, vacationland,XiHu (West Lake) Dis.Hu (West Lake) Dis.ent architectures and present day villa.
EPT are customized as for each your request
비슷한 EPT를 원하시면 다음과 같은 것을 고려해 보세요.
Working process
The total line incEPTs decoiler, forming EPT, personal computer controlling system and run out tables. Our EPTs are equipped with a laptop controlling program to hold items correct.
주요 매개변수
아니요 | 친절한 | 사양 | |
하나 | 원료 | 다양성 | 미군 병사 |
| 공급 폭 | 고객이 제공한 도면에 의존합니다. | ||
| 두께 | .3-.eight mm | ||
2 | 디코일러 | 작업 | Manual |
| WeigEPT 용량 | 5톤 | ||
3 | 주요 전체 신체 | 롤러 스테이션 | ten row |
| 샤프트의 직경 | fifty five mm | ||
| 샤프트 물질 | 0.05mm 크롬 도금된 45# | ||
| Roller materials | 0.05mm 크롬 도금이 된 45# | ||
| 유형 | EPT 유형 | ||
| 액자 | 300mm C형 빔 | ||
| Body thickness | 16mm | ||
| EPT | Cr 12 | ||
| 작업 | EPT 자동화 | ||
| Functioning speed | 8-12 m/min | ||
4 | EPT | 운전로 | 체인 1인치 |
| 주요 모터 | 4kW | ||
| 전압 | 380V/50HZ, three period | ||
5 | 손잡이 상자 | 전기로 작동하는 상자 | PLC 핸들 기술, invEPTr |
| PLC 제조업체 | EPTiwan에서 제조된 Delta | ||
| 인버터 모델 | EPTiwan에서 만들어진 Delta | ||
| 언어 | EPT와 EPT | ||
가이드 디코일러
It is passive type could load coil by expend the blots repair at coil interior diameter. It truly is easy to work and affordable answer.
서호(西湖) Dis.hu(西湖) Dis. 장치
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to manage the width and situation of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the correct situation and passed to the roll forming system. Can change the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT placement. It’s fastened structure to make positive can not shift simply.
롤 성형 방식:
Roll forming technique consist of EPT frame, EPT program, EPT motor and roll forming technique.
A. EPT 본체는 쇼트 블라스팅 및 도색 처리를 거친 용접 조성물을 채택합니다.
B. All rollers content undertake large quality No. 45 metal, with challenging chrome coated on floor, all treatment by total CNC EPTs, to make certain the rollers with very good rigidity and precision, and kind ideal roofing sheet as for every style.
C. All rolling shafts are created by high quality No. forty five metal with quench and temper treatment, so the shafts with excellent rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting construction sort is metal wall and welded with the basement with each other to have rigidity.
E. Cycloidal pin EPT speed EPT motor EPTn, the back/EPT roller EPTn by EPT, element of higher/lower rollers EPTn by EPT
F. Alter the screw bar manually to modify the distance between upper/reduce rollers for variation thickness of sheet.
(Interest: all rolling technique has adjusted in our company as a ideal circumstance, we do not recommend to change the rollers at random, if essential, ought to adjust by a skilled technician or soon after prepare by our engineer. In any other case will trigger the EPT can not kind a good profile
Reducing unit
A. Adopts post reducing, the cutting blade content is Cr12 with quenched treatment method, following cutting, there is no substance squandered.
B. 용접 프레임을 채택하여 뛰어난 강성을 확보했습니다.
C. The cutting motion is droved by the EPT from EPT station which ensures the procession of the cutting and reduced noisy, EPT existence.
EPT 기법
It is managed by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to start the chopping work.
이 방법에는 EPT 탱크 세트, EPT 오일 펌프 세트, EPT 파이프 2개, 그리고 전자기 밸브 세트 2개가 포함됩니다.
오일 펌프의 EPT: 3kW
EPT 오일: 40#
PLC control method
It adopts EPT laptop to handle. The target piece’s size is adjustable and digit of it can be adjusted. Computed mode has two modes: automatic and manual one. The technique is straightforward to work and use.
가공 정밀도: 1.00mm 이내
It is made up of liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of each component. Contact EPT
PLC는 EPTiwan Panasonic입니다.
변환기 브랜드명은 EPTiwan Delta입니다.
The seller should supply EPT and EPT language EPT
계수기
One particular counter gauges length, pulses, and decides size.
To examine EPT movie or much more confuse, make contact with with me
We EPT market to lots of nations around the world
저희 인증서
Business info
EPT group is a specialist maker designing and creating roll forming EPTs estabEPTd in 1996년 6월우리는 가지고 있습니다. 4개의 공장 operating in BeiEPTg, TianEPT and ZheJiang province. A lot more than four hundred workers provide services for u.
EPT mostly incEPT trapezoidal metal roof/wall panel EPT, C ampZ form purline EPT, freeway guardrail EPT, sandwich panel generation line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, cutting EPT, downpipe EPT, gutter EPT, etc.
저희 공급업체
1. Cost-free technological assistance and cost-free accessories offer.
2. Engineer accessible to service EPTry overEPT.
three. 1 calendar year warranty is presented.
4. EPT life technical guidance for free of charge.
5. We alwaEPToffer technological assistance, rapid reaction, all your inquire will be replied in 24 several hours.
Concern amp Reply
1. Q: How to visit our company:
A: 베이징 공항(BeiEPTg Airport)으로 비행기를 타고 이동한 후, 베이징 남역에서 항(HangEPT) 서역까지 고속 열차를 이용하세요.
(1hour), then we can choose up you to manufacturing facility(40min).
B: Fly to ZheJiang Airport: By fast practice From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.five hrs), then we can pick up you to manufacturing unit(40min).
2. Q: What need to I give if I want to custom-made EPT?
A: U require provide profile drawing, materials, thickness, voltage and your EPT needs.
3. 질문: 보증 내용은 무엇인가요?
A: In 12 mounts, all technicals are prepared to provide you at any time.
4. 질문: EPT가 손상된 경우 어떻게 해야 하나요?
A: Our EPT’s guarantee period is twelve months, if the damaged parts cannot fix, we will ship
new areas substitute the damaged areas free of charge, but you need shell out the convey EPT if following warranty interval. we can negotiate to solve the dilemma, and we source the complex assist for EPT daily life of equipment.
five. Q: If want technician to workshop to debug and educate, how to do?
A: We sent technician to your region to correct the EPT. Customer ought to bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical journey ticket and suitable accommodation, also customer must shell out the salary a hundred USD/working day.

