{"id":1392,"date":"2020-11-12T16:07:08","date_gmt":"2020-11-12T16:07:08","guid":{"rendered":"https:\/\/wormreducer.net\/in-novokuznetsk-russian-federation-sales-price-shop-near-me-near-me-shop-factory-supplier-fully-hydraulic-elbow-knuckle-telescopic-boom-marine-deck-crane-manufacturer-best-cos\/"},"modified":"2020-11-12T16:07:08","modified_gmt":"2020-11-12T16:07:08","slug":"in-novokuznetsk-russian-federation-sales-price-shop-near-me-near-me-shop-factory-supplier-fully-hydraulic-elbow-knuckle-telescopic-boom-marine-deck-crane-manufacturer-best-cos","status":"publish","type":"post","link":"https:\/\/wormreducer.net\/ur\/in-novokuznetsk-russian-federation-sales-price-shop-near-me-near-me-shop-factory-supplier-fully-hydraulic-elbow-knuckle-telescopic-boom-marine-deck-crane-manufacturer-best-cos\/","title":{"rendered":"Novokuznetsk \u0631\u0648\u0633\u06cc \u0641\u06cc\u0688\u0631\u06cc\u0634\u0646 \u06a9\u06cc \u0641\u0631\u0648\u062e\u062a \u0645\u06cc\u06ba\n\u0642\u06cc\u0645\u062a\n\u062f\u06a9\u0627\u0646\n\u0645\u06cc\u0631\u06d2 \u0642\u0631\u06cc\u0628\n\u0645\u06cc\u0631\u06d2 \u0642\u0631\u06cc\u0628 \u062f\u06a9\u0627\u0646\n\u0641\u06cc\u06a9\u0679\u0631\u06cc\n\u0633\u067e\u0644\u0627\u0626\u0631 \u0645\u06a9\u0645\u0644 \u0637\u0648\u0631 \u067e\u0631 \u06c1\u0627\u0626\u06cc\u0688\u0631\u0648\u0644\u06a9 \u06a9\u06c1\u0646\u06cc \u0646\u0648\u06a9\u0644 \u062f\u0648\u0631\u0628\u06cc\u0646 \u0628\u0648\u0645 \u0645\u06cc\u0631\u06cc\u0646 \u0688\u06cc\u06a9 \u06a9\u0631\u06cc\u0646 \u0628\u0646\u0627\u0646\u06d2 \u0648\u0627\u0644\u0627\n\u0628\u06c1\u062a\u0631\u06cc\u0646\n\u0644\u0627\u06af\u062a\n\u062d\u0633\u0628 \u0636\u0631\u0648\u0631\u062a\n\u0633\u0633\u062a\u0627\n\u062a\u06be\u0648\u06a9 \u0641\u0631\u0648\u0634"},"content":{"rendered":"

\"<\/p>\n

With several years’ encounter in this line, we will be dependable by our rewards in competitive cost, one particular-time shipping, prompt response, on-hand engineering assistance and great following-product sales solutions.Moreover, all our manufacturing processes are in compliance with ISO9001 standards. Each and every procedure, every part, each and every perform in EPG is demanded to be carried out a single phase adhering to one more, meticulously and cautiously, from content variety, reformation to producing equipment, from components heat remedy to computerized assembly, from quality handle to item inspection and screening and from purchase dealing to right after revenue services. EPG was awarded with “renowned solution of Zhejiang Province” and “renowned brand of Zhejiang Province”. Telescopic EPTT Maritime Crane
A telescopic offshore maritime crane makes it possible for you to have a EPTTer get to on a vessel. Currently being capable to retract the telescopic growth with outer telescopic EPTTes allows you to keep it less complicated on the deck of your vessel yielding a lot more area on the deck. EPT utilizes their telescopic boom maritime cranes on five of their elevate boats. Make the get to of your elevate with no compromising the area of your offshore offer vessel with GBM’s telescopic boom marine crane.
Fixed EPTT Marine Crane
A lot more affordable and easier to sustain, The set boom pedestal crane is more resilient and has much less moving components. The mounted growth pedestal crane is the perfect solution for stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd, regular lifting amp handling demands. A mounted increase maritime crane operates quicker and is mainly utilized to transportation groceries and more compact, more normal lifting amp dealing with functions.
EPTTNICAL Arrangement<\/p>\n

1. EPTT<\/p>\n

This agreement prepared in EPTT and EPTT language, should be according to EPTT language if contradiction accrue.
,,.
EPTT and content shall be according to the most recent stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds of BV Classification Culture established in force at the time when the contract is executed and the ship of the specification.
BV .
MANUFACTURE shall ensure the EPTT for a period of time of twelve months after the ship delivery.
\u0628\u0627\u0631\u06c1
7 DaEPTTprior to store shipping test for the equipment, MANUFACTURE should notify SHIPYARD to go to the test and at the very same time submit the inspection\/examination details to them.
seven ,\/.
This arrangement shall become powerful on the day when the agreement has been duly executed.
,.<\/p>\n

2. Simple technological specification<\/p>\n

Classification Modern society: BV Navigation: unrestricted
:
two.2 Rule and Regulation: BV <\/p>\n

2.3 Certificates needed<\/p>\n

Marine goods certificate by course<\/p>\n

Manufacture certification<\/p>\n

2.four StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd: ISO GB CB<\/p>\n

2.5 Temperature of environment: -100C—500C <\/p>\n

two.6 EPTTmmended lubrication oil type for the gear: EPTTort
:
two.7 Nameplate: In EPTT<\/p>\n

2.eight Painting:Floor disposal, brief blast to Sa two.five
: ,Sa2.five
EPTTr paint: 702 zinc epoxy prime 80 mu(dry)
: 702(eighty mu)
End paint: To be deterEPTTd stick to the ship operator later
:()
two.9 EPTT source: AC 440 V, 60 Hz, three Phi DC V<\/p>\n

2.ten EPTT insulation course: F<\/p>\n

two.eleven EPTT safety course: IP56<\/p>\n

two.12 EPTT with cable gland: With<\/p>\n

2.thirteen EPTT with earth bolt: With<\/p>\n

two.fourteen EPTT with area heater: With<\/p>\n

two.15 EPTT beginning technique: Y\/ #9651 commence
Y\/ #9651
2.sixteen EPTT in compliance with IEC requirement: Sure
\u0622\u0626\u06cc \u0627\u06cc \u0633\u06cc
2.seventeen EPTT components: Maker’s stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd<\/p>\n

EPTT component box EPTT component record in box<\/p>\n

three. Scope of drawing to be supplied<\/p>\n

three.one Acceptance drawing: two Copies<\/p>\n

three.two Functioning drawing (drawing modified in accordance to remarks): two Copies
()
three.3 Ultimate drawing: 2 Copies<\/p>\n

3.4 Following the contract is executed, MANUFACTURE must submit the acceptance drawings to SHIPOWNER,SHIPYARD and DESIGNER inside of 10 days.
fifteen ,,.
Right after getting the acceptance drawing, SHIPOWNER,SHIPYARD and DESIGNER will return 1 copy of acceptance drawing with feedback. If SHIPOWNER,SHIPYARD and DESIGNER have not returned the acceptance drawings within 20 times, that means has no comments on the approval drawing.
,,one, twenty ,,,,.
MANUFACTURE need to post the functioning drawings to SHIPOWNER,SHIPYARD and DESIGNER within ten daEPTTafter obtaining the approval drawings returned.
, ten ,.
Final drawing need to be sent to SHIPYARD jointly with the products.
.
Drawings’ language: EPTT language EPTT amp EPTT language
() (,)
four. Articles of drawings as pursuing:<\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n
\u0646\u06c1\u06cc\u06ba<\/td>\nTitle of drawing <\/td>\nAcceptance
Drawing<\/td>\n
\u06a9\u0627\u0645 \u06a9\u0631\u0646\u0627
Drawing<\/td>\n
Last
Drawing<\/td>\n
Remarks <\/td>\n<\/tr>\n
\u0627\u06cc\u06a9<\/td>\nInstruction<\/td>\n\u0636\u0631\u0648\u0631 <\/td>\n\u062c\u06cc \u06c1\u0627\u06ba <\/td>\n\u062c\u06cc \u06c1\u0627\u06ba<\/td>\n <\/td>\n<\/tr>\n
2<\/td>\nTest plan<\/td>\n\u062c\u06cc \u06c1\u0627\u06ba<\/td>\n\u0628\u06d2 \u0634\u06a9<\/td>\n\u0636\u0631\u0648\u0631<\/td>\n <\/td>\n<\/tr>\n
3<\/td>\nG.A<\/td>\n\u0628\u0627\u0644\u06a9\u0644<\/td>\n\u0628\u06d2 \u0634\u06a9 <\/td>\n\u0636\u0631\u0648\u0631<\/td>\n <\/td>\n<\/tr>\n
\u0686\u0627\u0631<\/td>\nEPTT system diagram<\/td>\n\u0628\u06d2 \u0634\u06a9<\/td>\n\u0636\u0631\u0648\u0631 <\/td>\n\u0636\u0631\u0648\u0631<\/td>\n <\/td>\n<\/tr>\n
\u067e\u0627\u0646\u0686<\/td>\nElectric powered circuit diagram<\/td>\n\u062c\u06cc \u06c1\u0627\u06ba<\/td>\n\u062c\u06cc \u06c1\u0627\u06ba <\/td>\n\u062c\u06cc \u06c1\u0627\u06ba<\/td>\n <\/td>\n<\/tr>\n
6<\/td>\nOverall of electric powered control box<\/td>\n\u0636\u0631\u0648\u0631<\/td>\n\u062c\u06cc \u06c1\u0627\u06ba <\/td>\n\u062c\u06cc \u06c1\u0627\u06ba<\/td>\n <\/td>\n<\/tr>\n
\u0633\u0627\u062a<\/td>\nEPTT areas listing<\/td>\n\u0628\u0627\u0644\u06a9\u0644<\/td>\n\u062c\u06cc \u06c1\u0627\u06ba <\/td>\n\u0628\u0627\u0644\u06a9\u0644<\/td>\n <\/td>\n<\/tr>\n
8<\/td>\nFactory Test report<\/td>\n <\/td>\n <\/td>\n\u0628\u06d2 \u0634\u06a9<\/td>\n <\/td>\n<\/tr>\n
9<\/td>\nFactory certification<\/td>\n <\/td>\n <\/td>\n\u062c\u06cc \u06c1\u0627\u06ba<\/td>\n <\/td>\n<\/tr>\n
\u062f\u0633<\/td>\nCourse certification (LR)
(LR)<\/td>\n
<\/td>\n <\/td>\n\u0628\u06d2 \u0634\u06a9<\/td>\n <\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

5. EPTT parameters<\/p>\n

SWL 2t<\/p>\n

Max. operating radius eight.5m<\/p>\n

Min. operating radius 2m<\/p>\n

EPTTing speed ~7m\/min() ~12m\/min()<\/p>\n

EPTTing top 20m<\/p>\n

EPTT velocity ~.5r\/min<\/p>\n

EPTT angle 3600<\/p>\n

Luffing time ~50s<\/p>\n

Doing work condition<\/p>\n

Trim le20<\/p>\n

Heel le50<\/p>\n

Elec-EPTT YB160M-4-H<\/p>\n

EPTT 11kW<\/p>\n

Velocity 1760r\/min<\/p>\n

EPTT Useful resource AC440V\/60HZ<\/p>\n

Begin Way Y\/ #9651<\/p>\n

Safeguard Quality IP56<\/p>\n

Insulation Quality F<\/p>\n

6. Scope of offer
.
6.one 2t\/eight.5m EPTT swing crane: 6set (inc. Management box).
2t\/8.5m:1().
six.two EPTT element ,this sort of as EPTT pump,EPTT motor,management valves use EPTTs , these factors have EPTT services network.
,,,,.()<\/p>\n

7. Certification<\/p>\n

MANUFACTURE is to offer BV certification.
BV .<\/p>\n

8. After-income support<\/p>\n

MANUFACTURE will cooperate with SHIPYARD in assembling and debugging.
,.<\/p>\n

nine. Guarantee period<\/p>\n

Incase these need to be any difficulty or damage on the gear which are due to the accountability to MANUFACTURE in guarantee period of 1 12 months after ship’s delivery ,MANUFACTURE will make the mend work for the damage part free of cost.
,,.<\/p>\n

2t\/eight.5m EPTT Crane<\/p>\n

Scope of provide<\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
\u0646\u06c1\u06cc\u06ba<\/td>\n\u0639\u0646\u0648\u0627\u0646<\/td>\nQty.<\/td>\n<\/tr>\n
\u0627\u06cc\u06a9<\/td>\n\u0627\u06cc \u067e\u06cc \u0679\u06cc \u0679\u06cc<\/td>\n1\/ 1 established<\/td>\n<\/tr>\n
2<\/td>\noperation system<\/td>\none\/ 1 established<\/td>\n<\/tr>\n
3<\/td>\nEPTTing winch<\/td>\none\/ 1 set<\/td>\n<\/tr>\n
4<\/td>\nPedestal<\/td>\none\/ 1 established<\/td>\n<\/tr>\n
\u067e\u0627\u0646\u0686<\/td>\nLuffing cylinder<\/td>\n1\/ 1sets<\/td>\n<\/tr>\n
\u0686\u06be<\/td>\nUpkeep platform<\/td>\none\/ 1 set<\/td>\n<\/tr>\n
7<\/td>\nHook<\/td>\none\/ 1 unit<\/td>\n<\/tr>\n
8<\/td>\nSteel wire rope<\/td>\none\/ one unit<\/td>\n<\/tr>\n
\u0646\u0648<\/td>\nOil tank<\/td>\n1\/ 1 set<\/td>\n<\/tr>\n
\u062f\u0633<\/td>\nEPTT device<\/td>\none\/ one unit<\/td>\n<\/tr>\n
11<\/td>\nEPT management box<\/td>\none\/ 1 established<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

EPTT areas list<\/p>\n\n\n\n\n\n\n\n\n\n\n
\u0646\u06c1\u06cc\u06ba<\/td>\nidentify<\/td>\nQty<\/td>\n<\/tr>\n
\u0627\u06cc\u06a9<\/td>\nHigher pressure tube<\/td>\n3\/ three pcs<\/td>\n<\/tr>\n
\u062f\u0648<\/td>\nEPTTt<\/td>\nthree\/ 3pcs<\/td>\n<\/tr>\n
\u062a\u06cc\u0646<\/td>\nSeal<\/td>\nthree\/ 3pcs<\/td>\n<\/tr>\n
\u0686\u0627\u0631<\/td>\nWasher<\/td>\n10\/ 10pcs<\/td>\n<\/tr>\n
5<\/td>\n quotO quot O-ring<\/td>\n10\/ 10pcs<\/td>\n<\/tr>\n
6<\/td>\nFuse<\/td>\nthree\/ 3pcs<\/td>\n<\/tr>\n
7<\/td>\nOil Cup<\/td>\nfive\/ 5pcs<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

Primary fittings checklist <\/p>\n\n\n\n\n\n\n\n\n\n
\u0646\u06c1\u06cc\u06ba<\/td>\n\u062a\u0641\u0635\u06cc\u0644<\/td>\nMaker<\/td>\namount<\/td>\n<\/tr>\n
1<\/td>\n\u0627\u0644\u06cc\u06a9\u0679\u0631\u06a9 \u0645\u0648\u0679\u0631<\/td>\nHangEPTT EPTT EPT EPTTry Co.,Ltd<\/td>\n\u0627\u06cc\u06a9<\/td>\n<\/tr>\n
\u062f\u0648<\/td>\nEPTT pump<\/td>\n()
Parker Hannifin Fluid EPTT Method and Factors ( ZheJiang ) Co,.Ltd<\/td>\n
1<\/td>\n<\/tr>\n
3<\/td>\nEPTTding valve<\/td>\n()
Parker Hannifin Fluid EPTT Method and Factors ( ZheJiang ) Co,.Ltd<\/td>\n
1<\/td>\n<\/tr>\n
4<\/td>\nFunctioning hand valve<\/td>\n()
Parker Hannifin Fluid EPTT System and Parts ( ZheJiang ) Co,.Ltd<\/td>\n
\u0627\u06cc\u06a9<\/td>\n<\/tr>\n
5<\/td>\nEPTT ring<\/td>\nZheJiang NingGuo EPTTChang EPTT ring Co,.Ltd<\/td>\n\u0627\u06cc\u06a9<\/td>\n<\/tr>\n
6<\/td>\nEPTTing winch<\/td>\n\u0627\u06cc \u067e\u06cc \u0679\u06cc \u0679\u06cc<\/td>\n1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

\n\n\n\n
\u0627\u06cc \u067e\u06cc \u0679\u06cc \u0679\u06cc<\/td>\n\u0627\u06cc\u06a9<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

\n\n\n\n
\u0627\u06cc \u067e\u06cc \u0679\u06cc \u0679\u06cc<\/td>\n\u0627\u06cc\u06a9<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

\n\n\n\n
\u0627\u06cc \u067e\u06cc \u0679\u06cc \u0679\u06cc<\/td>\n1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

\n\n\n\n
\u0627\u06cc \u067e\u06cc \u0679\u06cc \u0679\u06cc<\/td>\n1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

<\/p>\n

\n

\"<\/p>\n

\"<\/p>","protected":false},"excerpt":{"rendered":"

With several years’ encounter in this line, we will be dependable by our rewards in competitive cost, one particular-time shipping, prompt response, on-hand engineering assistance and great following-product sales solutions.Moreover, all our manufacturing processes are in compliance with ISO9001 standards. Each and every procedure, every part, each and every perform in EPG is demanded to […]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[2519,1281,1671,1286,2953,1282,1288,1675,2520],"class_list":["post-1392","post","type-post","status-publish","format-standard","hentry","category-worm-reducer","tag-boom-hydraulic","tag-hydraulic","tag-hydraulic-crane","tag-hydraulic-manufacturer","tag-hydraulic-marine","tag-hydraulic-shop","tag-price-hydraulic","tag-telescopic-hydraulic","tag-telescopic-hydraulic-boom"],"_links":{"self":[{"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/posts\/1392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/comments?post=1392"}],"version-history":[{"count":0,"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/posts\/1392\/revisions"}],"wp:attachment":[{"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/media?parent=1392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/categories?post=1392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wormreducer.net\/ur\/wp-json\/wp\/v2\/tags?post=1392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}