
focus in electricity transmission items, CATV items, mechanical seal, hydraulic and Pheumatic, and advertising goods. We are aiming to meet up with the needs of the clients around the world.. Much more importantly, we make specific components according to supplied drawings/samples and warmly welcome OEM inquiries. Telescopic EPTT Marine Crane
A telescopic offshore maritime crane allows you to have a EPTTer reach on a vessel. Becoming in a position to retract the telescopic increase with outer telescopic EPTTes makes it possible for you to keep it easier on the deck of your vessel yielding much more place on the deck. EPT uses their telescopic increase marine cranes on 5 of their lift boats. Make the attain of your lift without having compromising the space of your offshore offer vessel with GBM’s telescopic growth marine crane.
Set EPTT Marine Crane
A lot more reasonably priced and easier to keep, The fixed boom pedestal crane is more resilient and has considerably less shifting areas. The set boom pedestal crane is the perfect resolution for stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd, ordinary lifting amp managing requirements. A set growth marine crane operates more rapidly and is mainly employed to transportation groceries and more compact, more ordinary lifting amp handling needs.
EPTTNICAL Settlement
one. EPTT
This settlement prepared in EPTT and EPTT language, need to be according to EPTT language if contradiction accrue.
,,.
EPTT and substance shall be according to the most recent stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds of BV Classification Culture set in force at the time when the agreement is executed and the ship of the specification.
BV .
MANUFACTURE shall ensure the EPTT for a period of time of 12 months soon after the ship supply.
tolv.
seven DaEPTTprior to store supply check for the equipment, MANUFACTURE need to advise SHIPYARD to go to the test and at the exact same time submit the inspection/examination information to them.
seven ,/.
This arrangement shall grow to be powerful on the day when the contract has been duly executed.
,.
two. Basic technological specification
Classification Modern society: BV Navigation: unrestricted
:
two.2 Rule and Regulation: BV
2.three Certificates needed
Maritime merchandise certification by course
Manufacture certification
2.4 StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd: ISO GB CB
2.5 Temperature of setting: -100C—500C
2.six EPTTmmended lubrication oil sort for the gear: EPTTort
:
2.seven Nameplate: In EPTT
2.8 Portray:Surface disposal, brief blast to Sa two.5
: ,Sa2.five
EPTTr paint: 702 zinc epoxy prime 80 mu(dry)
: 702(80 mu)
Finish paint: To be deterEPTTd stick to the ship operator later on
:()
2.9 EPTT resource: AC 440 V, sixty Hz, 3 Phi DC V
2.10 EPTT insulation course: F
2.eleven EPTT safety course: IP56
2.twelve EPTT with cable gland: With
2.thirteen EPTT with earth bolt: With
2.14 EPTT with area heater: With
2.15 EPTT starting strategy: Y/ #9651 begin
Y/ #9651
2.16 EPTT in compliance with IEC prerequisite: Sure
IEC
two.seventeen EPTT parts: Maker’s stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd
EPTT element box EPTT component list in box
three. Scope of drawing to be supplied
three.one Acceptance drawing: two Copies
three.2 Working drawing (drawing modified according to feedback): two Copies
()
three.three Ultimate drawing: two Copies
3.4 After the contract is executed, MANUFACTURE should submit the approval drawings to SHIPOWNER,SHIPYARD and DESIGNER inside of ten times.
fifteen ,,.
Soon after obtaining the approval drawing, SHIPOWNER,SHIPYARD and DESIGNER will return 1 copy of acceptance drawing with comments. If SHIPOWNER,SHIPYARD and DESIGNER have not returned the acceptance drawings within 20 days, that implies has no responses on the acceptance drawing.
,,1, 20 ,,,,.
MANUFACTURE should submit the doing work drawings to SHIPOWNER,SHIPYARD and DESIGNER in 10 daEPTTafter obtaining the acceptance drawings returned.
, ten ,.
Closing drawing should be sent to SHIPYARD with each other with the tools.
.
Drawings’ language: EPTT language EPTT amp EPTT language
() (,)
4. Material of drawings as subsequent:
| No. | Name of drawing | Acceptance Drawing | Operating Drawing | Last Drawing | Remarks |
| 1 | Instruction | Ja | Verkligen | Ja | |
| 2 | Check system | Verkligen | Ja | Ja | |
| 3 | G.A | Säker | Säker | Säker | |
| fyra | EPTT system diagram | Naturligtvis | Verkligen | Naturligtvis | |
| fem | Electrical circuit diagram | Naturligtvis | Naturligtvis | Verkligen | |
| 6 | Overall of electrical handle box | Säker | Ja | Verkligen | |
| sju | EPTT elements checklist | Naturligtvis | Verkligen | Naturligtvis | |
| 8 | Factory Test report | Ja | |||
| nio | Factory certification | Ja | |||
| tio | Course certification (LR) (LR) | Naturligtvis |
5. EPTT parameters
SWL 2t
Max. operating radius 8.5m
Min. doing work radius 2m
EPTTing pace ~7m/min() ~12m/min()
EPTTing peak 20m
EPTT pace ~.5r/min
EPTT angle 3600
Luffing time ~50s
Working issue
Trim le20
Heel le50
Elec-EPTT YB160M-four-H
EPTT 11kW
Speed 1760r/min
EPTT Source AC440V/60HZ
Commence Way Y/ #9651
Protect Grade IP56
Insulation Grade F
6. Scope of offer
.
six.1 2t/8.5m EPTT swing crane: 6set (inc. Manage box).
2t/eight.5m:1().
6.2 EPTT part ,this sort of as EPTT pump,EPTT motor,handle valves use EPTTs , these elements have EPTT support network.
,,,,.()
7. Certification
MANUFACTURE is to source BV certificate.
BV .
8. Following-sales services
MANUFACTURE will cooperate with SHIPYARD in assembling and debugging.
,.
nine. Assure interval
Incase these must be any difficulty or harm on the tools which are owing to the accountability to MANUFACTURE inside of assure time period of 1 12 months soon after ship’s shipping and delivery ,MANUFACTURE will make the mend operate for the injury element cost-free of demand.
,,.
2t/eight.5m EPTT Crane
Scope of source
| No. | name | Qty. |
| 1 | EPTT | 1/ 1 set |
| två | procedure platform | one/ one established |
| tre | EPTTing winch | one/ 1 established |
| fyra | Pedestal | 1/ 1 set |
| fem | Luffing cylinder | 1/ 1sets |
| sex | Maintenance platform | 1/ one established |
| sju | Hook | 1/ 1 device |
| 8 | Metal wire rope | one/ one device |
| 9 | Oil tank | one/ 1 established |
| tio | EPTT device | one/ 1 unit |
| elva | EPT manage box | 1/ 1 set |
EPTT parts checklist
| No. | title | Qty |
| 1 | Substantial pressure tube | three/ three pcs |
| två | EPTTt | 3/ 3pcs |
| tre | Täta | 3/ 3pcs |
| 4 | Washer | 10/ 10pcs |
| 5 | quotO quot O-ring | ten/ 10pcs |
| sex | Fuse | 3/ 3pcs |
| sju | Oil Cup | 5/ 5pcs |
Main fittings listing
| No. | Beskrivning | Tillverkare | kvantitet |
| en | Electric powered motor | HangEPTT EPTT EPT EPTTry Co.,Ltd | en |
| 2 | EPTT-pump | () Parker Hannifin Fluid EPTT System and Factors ( ZheJiang ) Co,.Ltd | en |
| 3 | EPTTding valve | () Parker Hannifin Fluid EPTT Program and Elements ( ZheJiang ) Co,.Ltd | 1 |
| 4 | Operating hand valve | () Parker Hannifin Fluid EPTT Technique and Components ( ZheJiang ) Co,.Ltd | 1 |
| 5 | EPTT ring | ZheJiang NingGuo EPTTChang EPTT ring Co,.Ltd | 1 |
| 6 | EPTTing winch | EPTT | en |

